You don't have javascript enabled. Good luck with that.
Pencarian
Pendanaan Park and Ride Dilakukan Dengan Cara Buy Back

City to Build Park and Ride Through Buy Back System

Jakarta Provincial Government is scheduled to build a park and ride in some regions in the capital. As planned, its construction will use buy back system. 

We use buy back system

Head of Jakarta Transportation Dept, Andri Yansyah explained, through buy back system, the city would pay fund for park and ride project after physical project is done.

"We use buy back system. Construction is handed by the contractor and operator lies in us. Fund for its construction will be paid by way of installments of income," he stated, at City Hall, Monday (10/3).

Park and Ride Design Has Been Made

According to him, until now, the project is still under permit processing. So far, permit processing has been through two institutions, namely BPTSP and Jakarta Water Management Dept.

"We've coordinated with Water Management Dept about recommendation permit applicants related with parking project on the drains," he told.

Andri added, related with park and ride building provider, it was set on performance-based contract such as has been done in Electronic Road Pricing (ERP).

Linked News
Popular News indeks
  1. Fire at Pondok Bambu Allegedly Triggered by Electrical Short

    access_time19-05-2026 remove_red_eye1381 personNurito
  2. Governor Pramono Named Vice Chair of C40 Cities Steering Committee

    access_time18-05-2026 remove_red_eye1010 personAldi Geri Lumban Tobing
  3. Inundation on DI Panjaitan Road Recede

    access_time20-05-2026 remove_red_eye840 personNurito
  4. Dharma Jaya Ready for Thousands of Eid al-Adha Sacrifices

    access_time20-05-2026 remove_red_eye647 personAldi Geri Lumban Tobing
  5. Rasuna Said Car-Free Day to Return in June 2026

    access_time16-05-2026 remove_red_eye628 personAldi Geri Lumban Tobing