You don't have javascript enabled. Good luck with that.
Pencarian
Pendanaan Park and Ride Dilakukan Dengan Cara Buy Back
.
photo Reza Hapiz - Beritajakarta.id

City to Build Park and Ride Through Buy Back System

Jakarta Provincial Government is scheduled to build a park and ride in some regions in the capital. As planned, its construction will use buy back system. 

We use buy back system

Head of Jakarta Transportation Dept, Andri Yansyah explained, through buy back system, the city would pay fund for park and ride project after physical project is done.

"We use buy back system. Construction is handed by the contractor and operator lies in us. Fund for its construction will be paid by way of installments of income," he stated, at City Hall, Monday (10/3).

Park and Ride Design Has Been Made

According to him, until now, the project is still under permit processing. So far, permit processing has been through two institutions, namely BPTSP and Jakarta Water Management Dept.

"We've coordinated with Water Management Dept about recommendation permit applicants related with parking project on the drains," he told.

Andri added, related with park and ride building provider, it was set on performance-based contract such as has been done in Electronic Road Pricing (ERP).

Linked News
Popular News indeks
  1. Deputy Gov Rano: Meat Stocks Secured Up to Ramadhan

    access_time22-02-2025 remove_red_eye553 personBudhi Firmansyah Surapati
  2. Jakarta to Hold Cheap Food Bazaar at 193 Locations

    access_time22-02-2025 remove_red_eye445 personBudhi Firmansyah Surapati
  3. Pramono - Rano Expected to Realize Better Resident Welfare

    access_time20-02-2025 remove_red_eye309 personBudhi Firmansyah Surapati
  4. Jakartans Invited to Participate in HPSN 2025 Event

    access_time21-02-2025 remove_red_eye301 personAldi Geri Lumban Tobing
  5. 41 Wild Cats in Cikoko Sterilized

    access_time21-02-2025 remove_red_eye295 personTiyo Surya Sakti