You don't have javascript enabled. Good luck with that.
Pencarian
Pendanaan Park and Ride Dilakukan Dengan Cara Buy Back

City to Build Park and Ride Through Buy Back System

Jakarta Provincial Government is scheduled to build a park and ride in some regions in the capital. As planned, its construction will use buy back system. 

We use buy back system

Head of Jakarta Transportation Dept, Andri Yansyah explained, through buy back system, the city would pay fund for park and ride project after physical project is done.

"We use buy back system. Construction is handed by the contractor and operator lies in us. Fund for its construction will be paid by way of installments of income," he stated, at City Hall, Monday (10/3).

Park and Ride Design Has Been Made

According to him, until now, the project is still under permit processing. So far, permit processing has been through two institutions, namely BPTSP and Jakarta Water Management Dept.

"We've coordinated with Water Management Dept about recommendation permit applicants related with parking project on the drains," he told.

Andri added, related with park and ride building provider, it was set on performance-based contract such as has been done in Electronic Road Pricing (ERP).

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye869 personTiyo Surya Sakti
  2. TransJabodetabek Expansion, a Strategic Step to Increase Public Transportation Use

    access_time26-01-2026 remove_red_eye428 personFakhrizal Fakhri
  3. South Jakarta Tackles 38 Dengue Cases to Prevent Outbreak

    access_time02-02-2026 remove_red_eye384 personTiyo Surya Sakti
  4. Jakarta Prepares OMC and 200 Excavators to Prevent Flood

    access_time26-01-2026 remove_red_eye371 personDessy Suciati
  5. Jakarta Showers to Make Way for Partly Cloudy Skies

    access_time30-01-2026 remove_red_eye359 personDessy Suciati
close