You don't have javascript enabled. Good luck with that.
Pencarian
PPSU Lubang Buaya Perbaiki Turap Kali Sunter yang Ambrol

Collapsed Sheet Pile in Lubang Buaya Repaired

Around 15 PPSU officers from Lubang Buaya Urban Village, Cipayung began repairing the collapsed sheet pile of Sunter River, Jl Masjid Al Umar 2, RT 01/12. 

We repair it temporarily to prevent unwanted things. If not, it can lead to erosion

Lubang Buaya Urban Village Head, Fathoni disclosed the repair is temporary. His side has sent proposal letter about reparation to the Water Management Sub-dept a few days ago. 

The repair itself was the mandate of East Jakarta Mayor, Bambang Musyawardana, who surveyed the location yesterday afternoon.

Collapsed Sheet Pile in Lubang Buaya will Be Repaired Soon

"We repair it temporarily to prevent unwanted things. If not, it can lead to erosion. Mr. Mayor instructed a temporary repair yesterday, and we do it today," he told.

To accelerate it, at 2 PM, the other PPSU officer who has run their duty will be called to repair the sheet pile. It is hoped could be completed today if there is no obstacle.

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye869 personTiyo Surya Sakti
  2. TransJabodetabek Expansion, a Strategic Step to Increase Public Transportation Use

    access_time26-01-2026 remove_red_eye424 personFakhrizal Fakhri
  3. Jakarta Prepares OMC and 200 Excavators to Prevent Flood

    access_time26-01-2026 remove_red_eye371 personDessy Suciati
  4. Jakarta Showers to Make Way for Partly Cloudy Skies

    access_time30-01-2026 remove_red_eye358 personDessy Suciati
  5. Several Microtrans Routes Diverted

    access_time31-01-2026 remove_red_eye358 personAldi Geri Lumban Tobing
close