You don't have javascript enabled. Good luck with that.
Pencarian
Bupati Minta Dilakukan Segera Percepatan Penyerapan Anggaran

Physical Construction in Seribu Islands Reached 60 Percent

Regent of Seribu Islands, Budi Utomo, revealed that his rank to boost the absorption physical construction that has reached 60 percent.

The physical construction such as pier, IPAL and so on, must be accelerated its absorption

"The physical construction such as pier, IPAL and so on, must be accelerated its absorption," he stated, Tuesday (11/22).

If it could be completed quickly, this year's budget absorption would reach 80 percent until the end of this year in accordance with the target.

Clean Water Procurement in Seribu Islands Stopped

"We also asked the Event Activity Technical Managing Official (PPTK) to monitor the entire work, thus it can finish based on the target," he finished.

Linked News
Popular News indeks
  1. Transjakarta Resumes Operations with Strategic Service Adjustments

    access_time28-08-2026 remove_red_eye927 personAldi Geri Lumban Tobing
  2. Jakarta Deploys 120 Personnel to Counteract Traffic Disruption for Today’s Protests

    access_time27-08-2026 remove_red_eye817 personAldi Geri Lumban Tobing
  3. JIF Summit 2026 Drives Global Partnerships and Investment Growth in Jakarta

    access_time28-08-2026 remove_red_eye648 personAldi Geri Lumban Tobing
  4. JITEX 2026: Fostering a Global Trade and Investment Ecosystem

    access_time01-09-2026 remove_red_eye509 personAldi Geri Lumban Tobing
  5. Transjakarta Commits to Accelerating Modal Integration and Fleet Electrification

    access_time31-08-2026 remove_red_eye497 personAldi Geri Lumban Tobing