You don't have javascript enabled. Good luck with that.
Pencarian
Pembangunan Trotoar Ramah Disabilitas di Jakut Rampung

Disabled-Friendly Sidewalk in N. Jakarta Construction Completed

The construction of disabled-friendly sidewalk on four roads in North Jakarta are completed

The rest will be used to plant trees

North Jakarta Head Sub-dept. of Bina Marga, Hamdan, said mostly the sidewalks construction is completed 90 percent.

“The rest will be used to plant trees,” he said, Sunday (12/25).

Sidewalk Widening Project in 42 Locations Accelerated

The sidewalks are on Jalan Akses Marunda by one km and 3.2 m, Jalan Kramat Raya, in front of Jakarta Islamic Center (JIC) by 930 m and 2.87 m.

Next are on Jalan Sudarso by 1.4km and 2.3 m, Jalan Stasiun Tanjung Priok by 737 m and 3.6 m, Jalan Gunung Sahari and Hidup Baru by 753 m and 2.4 m.

“The last is on Jalan Pluit Timur by 972 m and 2.7 m,” said Hamdan.

According to him, the sidewalks are constructed by using floor hardener material for disabled people lane.

“There is also sparing pipe for utility,” he closed.

Linked News
Popular News indeks
  1. Jakarta Taps MSMEs and Creative Economy to Secure Global Top 50 Spot

    access_time11-07-2026 remove_red_eye1589 personAldi Geri Lumban Tobing
  2. Ciliwung River Normalization Accelerated, Pramono Ensures Land Acquisition Without Intermediaries

    access_time10-07-2026 remove_red_eye1440 personDessy Suciati
  3. Blocked Drain on Jalan Palmerah Utara is Being Repaired

    access_time10-07-2026 remove_red_eye1303 personFolmer
  4. Jalan Kebon Kelapa I Repaved

    access_time07-07-2026 remove_red_eye1096 personNurito
  5. Pramono Inaugurates Mayapada Hospital to Improve Healthcare Services

    access_time09-07-2026 remove_red_eye967 personDessy Suciati