You don't have javascript enabled. Good luck with that.
Pencarian
DKI Siapkan Rp 93 Miliar Bangun SWRO di Delapan Titik

City Prepares Rp 93 Billion to Build SWRO at Eight Points

Jakarta Provincial Government budgeting Rp 93 Billion to build Water Management with Sea Water Reserve Osmosis (SWRO) system in eight locations in Seribu Islands this year.

This year we budgeting Rp 93 billion to continue the construction

Acting Jakarta Governor Sumarsono said that 8 points of SWRO construction are continuation from last year's failed projects.

"This year we budgeting Rp 93 billion to continue the construction," he said at City Hall, Wednesday (1/18).

Water Treatment Installation Provided at Six Islands

He is optimistic that the failure last year will not happen again this year because his side will tighten the tender process.

"I want the chosen contractor know the project well," he added.

He expressed that SWRO construction plan in eight points this year just reached five percent only. Because of that, City cut work contract with tender winner.

"We budgeting it again at least similar to this year which is given by Ministry of Public Infrastructure and Housing (KemenPU-PERA)," he continued.

For information, KemenPU-PERA gave Drinking Water Supply System (SPAM) to City. SPAM itself was build in Untung Jawa Island with SWRO technology. 

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye869 personTiyo Surya Sakti
  2. TransJabodetabek Expansion, a Strategic Step to Increase Public Transportation Use

    access_time26-01-2026 remove_red_eye424 personFakhrizal Fakhri
  3. Jakarta Prepares OMC and 200 Excavators to Prevent Flood

    access_time26-01-2026 remove_red_eye371 personDessy Suciati
  4. Jakarta Showers to Make Way for Partly Cloudy Skies

    access_time30-01-2026 remove_red_eye358 personDessy Suciati
  5. Several Microtrans Routes Diverted

    access_time31-01-2026 remove_red_eye358 personAldi Geri Lumban Tobing
close