You don't have javascript enabled. Good luck with that.
Pencarian
Saluran PHB Jl I Gusti Ngurah Rai akan Dinormalisasi

Connecting Drain on Jl I Gusti Ngurah Rai will Be Normalized

The drain will be deepened up to four meters. Afterwards, we will do plastering

A connecting drain (PHB) on south side of Jalan I Gusti Ngurah Rai, Duren Sawit will be normalized. Besides deepening, some parts will be plastered.

East Jakarta Water Resources Sub-dept. Head, Ahmad Yazied Bustomi disclosed normalization aims to increase water capacity. Thus it could overcome inundation in a settlement of Jalan Nusa Indah VI, Duren Sawit.

Tegal Amba Connecting Drain Normalized

"The drain will be deepened up to four meters. Afterwards, we will do plastering," he stated, Tuesday (1/24).

He explains the drain as long as 800 meters has 3-3.5 meters wide. As planned, it will be started in early February.

"It will take about three months. This week, we began mobilizing logistic," he said.

Linked News
Popular News indeks
  1. Central Jakarta Administration Acts Swiftly to Handle Kebon Kosong Fire

    access_time02-06-2026 remove_red_eye1417 personFolmer
  2. Jakarta Waives Motor Vehicle Tax Fines and Title Transfer Fees

    access_time01-06-2026 remove_red_eye854 personAldi Geri Lumban Tobing
  3. Commemorating Vesak, Jakarta Lights Up with Illumination of Jakarta 2026

    access_time30-05-2026 remove_red_eye653 personBudhi Firmansyah Surapati
  4. Seniors Participate in Pasti Bisa Berkarya at MRT Stations

    access_time02-06-2026 remove_red_eye602 personAldi Geri Lumban Tobing
  5. Krendang Fire Victims Receive Proper Support and Assistance

    access_time29-05-2026 remove_red_eye475 personBudhi Firmansyah Surapati