You don't have javascript enabled. Good luck with that.
Pencarian
 Saluran PHB Tegal Amba Dinormalisasi

Tegal Amba Connecting Drain Normalized

The Tegal Amba connecting drain (PHB) in Duren Sawit Sub-district, East Jakarta is normalized. It is targeted to be finished in the upcoming April.

Normalization aims to solve inundation in Wijaya Kusuma and on Jalan Kesenian

East Jakarta Water Resources Sub-dept. Head, A Yazied Bustomi disclosed, the normalization is done by dredging and repairing the damaged sheet pile. At this time, the drain deep is only two meters.

Pulogadung PHB Inspection Road Collapsed

"The drain will be deepened up to 1.2-1.5 meters. So, it would be 3.5 meters," he stated, Friday (1/20).

He explained that dredging is conducted by sending two amphibious excavators and one unit of long-arm. Considering limited location, dredging will be carried out alternately.

"This drain empties into Sunter River. Normalization aims to solve inundation in Wijaya Kusuma and on Jalan Kesenian," he finished.

Linked News
Popular News indeks
  1. Pram-Rano Attend Bung Karno Festival at Proklamasi Park

    access_time20-06-2026 remove_red_eye1090 personFolmer
  2. JIS-Ancol Integrated Infrastructure Officially Activated

    access_time23-06-2026 remove_red_eye573 personDessy Suciati
  3. Free Cake-Making Training Held at RPTRA Mustika Ratu

    access_time23-06-2026 remove_red_eye499 personNurito
  4. Metropolitan City Rally 2026 to Be Held at City Hall

    access_time19-06-2026 remove_red_eye476 personAldi Geri Lumban Tobing
  5. Rano Officially Opens Discover Betawi Art and Culture 2026

    access_time19-06-2026 remove_red_eye474 personBudhi Firmansyah Surapati