You don't have javascript enabled. Good luck with that.
Pencarian
Saluran PHB Jl I Gusti Ngurah Rai akan Dinormalisasi
.
photo Ilustrasi - Beritajakarta.id

Connecting Drain on Jl I Gusti Ngurah Rai will Be Normalized

The drain will be deepened up to four meters. Afterwards, we will do plastering

A connecting drain (PHB) on south side of Jalan I Gusti Ngurah Rai, Duren Sawit will be normalized. Besides deepening, some parts will be plastered.

East Jakarta Water Resources Sub-dept. Head, Ahmad Yazied Bustomi disclosed normalization aims to increase water capacity. Thus it could overcome inundation in a settlement of Jalan Nusa Indah VI, Duren Sawit.

Tegal Amba Connecting Drain Normalized

"The drain will be deepened up to four meters. Afterwards, we will do plastering," he stated, Tuesday (1/24).

He explains the drain as long as 800 meters has 3-3.5 meters wide. As planned, it will be started in early February.

"It will take about three months. This week, we began mobilizing logistic," he said.

Linked News
Popular News indeks
  1. Transjakarta Targets Planting 100,000 Mangroves

    access_time12-07-2025 remove_red_eye414 personBudhi Firmansyah Surapati
  2. Rano Karno Celebrates City's Anniversary with Kamal Residents

    access_time12-07-2025 remove_red_eye397 personFolmer
  3. Residents Enthusiastically Enjoy the Car Free Day in Kebayoran Lama

    access_time13-07-2025 remove_red_eye353 personTiyo Surya Sakti
  4. Traffic Engineering on Jalan Otista to Begin July 20 Due to JPO Revitalization

    access_time17-07-2025 remove_red_eye325 personAldi Geri Lumban Tobing
  5. MRT Jakarta Considers Route Expansion to South Tangerang

    access_time13-07-2025 remove_red_eye317 personAldi Geri Lumban Tobing

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik