You don't have javascript enabled. Good luck with that.
Pencarian
Saluran PHB Jl I Gusti Ngurah Rai akan Dinormalisasi

Connecting Drain on Jl I Gusti Ngurah Rai will Be Normalized

The drain will be deepened up to four meters. Afterwards, we will do plastering

A connecting drain (PHB) on south side of Jalan I Gusti Ngurah Rai, Duren Sawit will be normalized. Besides deepening, some parts will be plastered.

East Jakarta Water Resources Sub-dept. Head, Ahmad Yazied Bustomi disclosed normalization aims to increase water capacity. Thus it could overcome inundation in a settlement of Jalan Nusa Indah VI, Duren Sawit.

Tegal Amba Connecting Drain Normalized

"The drain will be deepened up to four meters. Afterwards, we will do plastering," he stated, Tuesday (1/24).

He explains the drain as long as 800 meters has 3-3.5 meters wide. As planned, it will be started in early February.

"It will take about three months. This week, we began mobilizing logistic," he said.

Linked News
Popular News indeks
  1. Jakarta Govt-City Council Step Up Coordination to Address Key Urban Challenges

    access_time22-02-2026 remove_red_eye1355 personFakhrizal Fakhri
  2. Transjakarta Brings Lunar New Year Festivities to Public Transport

    access_time16-02-2026 remove_red_eye1025 personAldi Geri Lumban Tobing
  3. Free Transit Card Applications Skyrocket 143%, Passing 76k Mark

    access_time20-02-2026 remove_red_eye957 personAldi Geri Lumban Tobing
  4. CNY 2577 Kongzili: Matakin Calls for Justice and Solidarity

    access_time22-02-2026 remove_red_eye763 personAldi Geri Lumban Tobing
  5. Public Works Agency Gets Transjakarta Corridor 13 Back in Tip-Top Shape

    access_time17-02-2026 remove_red_eye732 personAldi Geri Lumban Tobing