You don't have javascript enabled. Good luck with that.
Pencarian
Saluran PHB Jl I Gusti Ngurah Rai akan Dinormalisasi
.
photo Ilustrasi - Beritajakarta.id

Connecting Drain on Jl I Gusti Ngurah Rai will Be Normalized

The drain will be deepened up to four meters. Afterwards, we will do plastering

A connecting drain (PHB) on south side of Jalan I Gusti Ngurah Rai, Duren Sawit will be normalized. Besides deepening, some parts will be plastered.

East Jakarta Water Resources Sub-dept. Head, Ahmad Yazied Bustomi disclosed normalization aims to increase water capacity. Thus it could overcome inundation in a settlement of Jalan Nusa Indah VI, Duren Sawit.

Tegal Amba Connecting Drain Normalized

"The drain will be deepened up to four meters. Afterwards, we will do plastering," he stated, Tuesday (1/24).

He explains the drain as long as 800 meters has 3-3.5 meters wide. As planned, it will be started in early February.

"It will take about three months. This week, we began mobilizing logistic," he said.

Linked News
Popular News indeks
  1. Transjakarta Officially Opens School for Bus Drivers

    access_time20-11-2024 remove_red_eye1045 personAldi Geri Lumban Tobing
  2. Acting Governor Teguh: Coastal Seawall Construction Begins in 2025

    access_time20-11-2024 remove_red_eye908 personFolmer
  3. Legislator Ahmad Lukman Jupiter Wants PT FSTJ Add Shop Cars

    access_time19-11-2024 remove_red_eye553 personDessy Suciati
  4. PMPTSP Agency Launches PIN Greenvest to Prompt Green and Sustainable Investment

    access_time21-11-2024 remove_red_eye449 personAldi Geri Lumban Tobing
  5. Transjakarta Extends its Operation to 11 PM Today

    access_time19-11-2024 remove_red_eye386 personAldi Geri Lumban Tobing