You don't have javascript enabled. Good luck with that.
Pencarian
Turap Saluran Penghubung Jl Nias Yang Ambrol Diperbaiki)
.
photo TP Moan Simanjuntak - Beritajakarta.id

Connector Channel's Retaining Wall on Jl. Nias Repaired

North Jakarta Water Resources Dept. repaired Nias Connector Channel (PHB)'s retaining wall on Jl. Nias, West Kelapa Gading Urban Village, Kelapa Gading Sub-District which ruined before.

It also makes soil on the roadside got into the water channel. If it is not repaired immediately, soil could hamper the water flow

Kelapa Gading Sub-district Water Resources Work Unit Head, Rukmana, said that the retaining wall is repaired for about 50 meters long with height more than 1 meter. Because it is quite old and eroded by water, the retaining wall is ruined.

"It also makes soil on the roadside got into the water channel. If it is not repaired immediately, soil could hamper the water flow," she said, Tuesday (2/6).

Citizens Request to Build Water Channel

According to her, the construction is done about 95 percent. If things going smoothly, it can finish in next two days.

"It is already raining season. With improving the ruined channel's retaining wall, it can keep the area from flood," she closed.

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye867 personTiyo Surya Sakti
  2. TransJabodetabek Expansion, a Strategic Step to Increase Public Transportation Use

    access_time26-01-2026 remove_red_eye423 personFakhrizal Fakhri
  3. Jakarta Prepares OMC and 200 Excavators to Prevent Flood

    access_time26-01-2026 remove_red_eye370 personDessy Suciati
  4. Jakarta Showers to Make Way for Partly Cloudy Skies

    access_time30-01-2026 remove_red_eye355 personDessy Suciati
  5. Several Microtrans Routes Diverted

    access_time31-01-2026 remove_red_eye349 personAldi Geri Lumban Tobing
close