You don't have javascript enabled. Good luck with that.
Pencarian
Turap Saluran Penghubung Jl Nias Yang Ambrol Diperbaiki)
.
photo TP Moan Simanjuntak - Beritajakarta.id

Connector Channel's Retaining Wall on Jl. Nias Repaired

North Jakarta Water Resources Dept. repaired Nias Connector Channel (PHB)'s retaining wall on Jl. Nias, West Kelapa Gading Urban Village, Kelapa Gading Sub-District which ruined before.

It also makes soil on the roadside got into the water channel. If it is not repaired immediately, soil could hamper the water flow

Kelapa Gading Sub-district Water Resources Work Unit Head, Rukmana, said that the retaining wall is repaired for about 50 meters long with height more than 1 meter. Because it is quite old and eroded by water, the retaining wall is ruined.

"It also makes soil on the roadside got into the water channel. If it is not repaired immediately, soil could hamper the water flow," she said, Tuesday (2/6).

Citizens Request to Build Water Channel

According to her, the construction is done about 95 percent. If things going smoothly, it can finish in next two days.

"It is already raining season. With improving the ruined channel's retaining wall, it can keep the area from flood," she closed.

Linked News
Popular News indeks
  1. 250 High School Students in N. Jakarta Learn to Create Digital Content

    access_time01-11-2024 remove_red_eye795 personBudhi Firmansyah Surapati
  2. W. Jakarta SDA Constructs Channel on Jalan Nurul Muslimin I Kembangan

    access_time04-11-2024 remove_red_eye780 personTP Moan Simanjuntak
  3. 18 School Principals Participate in Public Agency E-Monev Presentation

    access_time02-11-2024 remove_red_eye479 personFolmer
  4. Tanah Tinggi Residents Participate in Computer Operator Training

    access_time02-11-2024 remove_red_eye377 personBudhi Firmansyah Surapati
  5. 104 Wild Cats in Kebayoran Lama Sterilized

    access_time07-11-2024 remove_red_eye345 personTiyo Surya Sakti