You don't have javascript enabled. Good luck with that.
Pencarian
Turap Saluran Penghubung Jl Nias Yang Ambrol Diperbaiki)

Connector Channel's Retaining Wall on Jl. Nias Repaired

North Jakarta Water Resources Dept. repaired Nias Connector Channel (PHB)'s retaining wall on Jl. Nias, West Kelapa Gading Urban Village, Kelapa Gading Sub-District which ruined before.

It also makes soil on the roadside got into the water channel. If it is not repaired immediately, soil could hamper the water flow

Kelapa Gading Sub-district Water Resources Work Unit Head, Rukmana, said that the retaining wall is repaired for about 50 meters long with height more than 1 meter. Because it is quite old and eroded by water, the retaining wall is ruined.

"It also makes soil on the roadside got into the water channel. If it is not repaired immediately, soil could hamper the water flow," she said, Tuesday (2/6).

Citizens Request to Build Water Channel

According to her, the construction is done about 95 percent. If things going smoothly, it can finish in next two days.

"It is already raining season. With improving the ruined channel's retaining wall, it can keep the area from flood," she closed.

Linked News
Popular News indeks
  1. MRT Jakarta Integrates Ticket Payments with JakLingko from October 12

    access_time10-10-2026 remove_red_eye560 personAldi Geri Lumban Tobing
  2. Jakarta Administration Steps Up Proactive Fire Prevention Efforts

    access_time09-10-2026 remove_red_eye550 personDessy Suciati
  3. New Kelapa Gading-Pulogadung Road to Ease Traffic and Improve Access

    access_time10-10-2026 remove_red_eye539 personAldi Geri Lumban Tobing
  4. Kramat Pulo Fire Survivors Get Help Replacing School Documents

    access_time09-10-2026 remove_red_eye526 personFolmer
  5. Basic Supplies Distributed to Pinang Ranti Fire Survivors

    access_time09-10-2026 remove_red_eye512 personNurito