You don't have javascript enabled. Good luck with that.
Pencarian
Turap Saluran Penghubung Jl Nias Yang Ambrol Diperbaiki)

Connector Channel's Retaining Wall on Jl. Nias Repaired

North Jakarta Water Resources Dept. repaired Nias Connector Channel (PHB)'s retaining wall on Jl. Nias, West Kelapa Gading Urban Village, Kelapa Gading Sub-District which ruined before.

It also makes soil on the roadside got into the water channel. If it is not repaired immediately, soil could hamper the water flow

Kelapa Gading Sub-district Water Resources Work Unit Head, Rukmana, said that the retaining wall is repaired for about 50 meters long with height more than 1 meter. Because it is quite old and eroded by water, the retaining wall is ruined.

"It also makes soil on the roadside got into the water channel. If it is not repaired immediately, soil could hamper the water flow," she said, Tuesday (2/6).

Citizens Request to Build Water Channel

According to her, the construction is done about 95 percent. If things going smoothly, it can finish in next two days.

"It is already raining season. With improving the ruined channel's retaining wall, it can keep the area from flood," she closed.

Linked News
Popular News indeks
  1. Jakarta Govt-City Council Step Up Coordination to Address Key Urban Challenges

    access_time22-02-2026 remove_red_eye1107 personFakhrizal Fakhri
  2. Transjakarta Brings Lunar New Year Festivities to Public Transport

    access_time16-02-2026 remove_red_eye995 personAldi Geri Lumban Tobing
  3. Free Transit Card Applications Skyrocket 143%, Passing 76k Mark

    access_time20-02-2026 remove_red_eye950 personAldi Geri Lumban Tobing
  4. Public Works Agency Gets Transjakarta Corridor 13 Back in Tip-Top Shape

    access_time17-02-2026 remove_red_eye725 personAldi Geri Lumban Tobing
  5. Chinese New Year Holiday, Ancol Flocked by Visitors

    access_time16-02-2026 remove_red_eye627 personAnita Karyati