You don't have javascript enabled. Good luck with that.
Pencarian
JLNT Tendean-Ciledug akan Dipasangi 300 Lampu LED SS
.
photo Nurito - Beritajakarta.id

300 LED Lamps to Be Installed at Tendean-Ciledug JLNT

Around 300 lamps type light emitting diode smart system (LED SS) will be installed along Tendean-Ciledug Non Toll Flyover (JLNT). It is conducted after road physical is completed.

Fund for lamp installation in each JLNT will spend Rp 2.7 billion

Jakarta Industry and Energy Dept. Head, Yuli Hartono disclosed each lamp has 200 watts power. Thus far it is still being prepared for e-catalog auction.

12 LED Lamps Installed at Jakarta Kejati Building

Supposedly, lamp installation at JLNT that connects with South Jakarta and South Tangerang is conducted in 2016. Because of unfinished construction, it had to be delayed.

"We will put up 300 lamps along Tendean-Cilincing JLNT. Fund for lamp installation in each JLNT will spend Rp 2.7 billion. And it will enter into auction stage," she told, Thursday (2/9).

It is targeted will be installed in the upcoming May-June. Thus it could support JLNT operational, particularly for Transjakarta bus.

Linked News
Popular News indeks
  1. Jakarta to Go Dark for One Hour on April 26, 2025

    access_time24-04-2025 remove_red_eye1175 personAldi Geri Lumban Tobing
  2. Pramono Wants to Strengthen Betawi Culture

    access_time26-04-2025 remove_red_eye325 personDessy Suciati
  3. Residents Advised to Apply for PPSU and Damkar Positions at Urban Village Offices

    access_time23-04-2025 remove_red_eye311 personFakhrizal Fakhri
  4. Earth Day, Pramono Encourages Citizens to Switch Off Lights Simultaneously

    access_time26-04-2025 remove_red_eye298 personDessy Suciati
  5. City Goverment Encourages Residents to Use Public Transportation

    access_time21-04-2025 remove_red_eye296 personFakhrizal Fakhri

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik