You don't have javascript enabled. Good luck with that.
Pencarian
Jokowi Ingin Simpang Susun Semanggi Selesai Tepat Waktu

Jokowi Wants Semanggi Interchanges Finishes On Time

President Joko Widodo observed Semanggi Interchanges (Simpang Susun Semanggi) and Mass Rapid Transit (MRT) construction. Hopefully, these two projects can decrease traffic jam in the City.

Insya Allah on the mid year it can be used officially

On the field observation, Jokowi was assisted by City Governor, Basuki Tjahaja Purnama and Minister of Public Housing and General Duties, Basuki Hadimuljono.

"We hope with finishing this, Insya Allah on the mid year it can be used officially. So this can be a solution of traffic jam in Semanggi," he said on Semanggi area, Thursday (2/23).

Semanggi Interchange Project Is According to Schedule

Semanggi Interchanges is built through compensation of Japanese Company's Building Floor Coefficient (KLB) rise. Its construction targeted to finish in August 2017.

After observing Semanggi Interchanges, they went to MRT construction project, precisely in Setiabudi Station. The visit was aimed to observe the finished underground drilling.

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye868 personTiyo Surya Sakti
  2. TransJabodetabek Expansion, a Strategic Step to Increase Public Transportation Use

    access_time26-01-2026 remove_red_eye424 personFakhrizal Fakhri
  3. Jakarta Prepares OMC and 200 Excavators to Prevent Flood

    access_time26-01-2026 remove_red_eye371 personDessy Suciati
  4. Jakarta Showers to Make Way for Partly Cloudy Skies

    access_time30-01-2026 remove_red_eye358 personDessy Suciati
  5. Several Microtrans Routes Diverted

    access_time31-01-2026 remove_red_eye355 personAldi Geri Lumban Tobing
close