You don't have javascript enabled. Good luck with that.
Pencarian
Dua Ekskavator Keruk PHB Taman Alfa

Two Excavators Dredged Taman Alfa Channel

Two excavators deployed by South Jakarta Water Resources Sub-dept. to dredge Taman Alfa connecting (PHB) channel, Petukangan Utara Urban Village, Pesanggrahan, Friday (3/17).

It is dredged to 1.5 meters depth, 800 meters long, and 6 meters wide

Pesanggrahan Sub-district Head, Agus Irwanto said this is one of the ways to minimize flood due to overflowed PHB water.

"It is dredged to 1.5 meters depth, 800 meters long, and 6 meters wide," he said.

Residents Request to Normalize Taruna PHB Channel

He added the dredged mud from PHB channel was transported to Rawa Minyak, Pasar Minggu by using Water Resources Sub-dept. truck.

"I wish with this dredging, Petukangan area that prone to flood can be resolved. At least water level could decrease," he closed.

Linked News
Popular News indeks
  1. Open for All: Jakarta City Hall Welcomes Visitors for Namu Balai Kota

    access_time03-10-2026 remove_red_eye748 personDessy Suciati
  2. Transjakarta Reaffirms Ban on Busking in Mikrotrans and Bus Stops

    access_time02-10-2026 remove_red_eye545 personAldi Geri Lumban Tobing
  3. 1,500 Runners and Pets Hit the Track for World Rabies Day Run 2026

    access_time03-10-2026 remove_red_eye536 personAnita Karyati
  4. Commission D Supports Reserve Fund for Long-Term Infrastructure

    access_time02-10-2026 remove_red_eye518 personFakhrizal Fakhri
  5. Jakarta Logs 0.13% Inflation as Chicken, Chili, and Rice Push Prices Up

    access_time03-10-2026 remove_red_eye503 personFakhrizal Fakhri