You don't have javascript enabled. Good luck with that.
Pencarian
Tiga Jalur Bus di Eks Terminal Lebak Bulus Ditutup

Three Bus Lanes in Lebak Bulus Ex-Terminal Closed

130 compiled personnel of Satpol PP, South Jakarta Transportation Sub-dept., TNI, and Polri held integrated controlling in Lebak Bulus ex-Terminal, Cilandak, that will be built depot and Mass Rapid Transit (MRT) station.

For MRT project construction, we also closed three bus lanes

In that controlling, personnel closed three inter city-inter province (AKAP) bus lanes and controlled street vendors at once.

Cilandak Sub-district Head, Tomy Fudihartono said street vendors was controlled because in the location will be used for MRT project construction.

AKAP Bus Still Operates at Lebak Bulus Terminal

"For MRT project construction, we also closed three bus lanes," he said, Friday (3/31).

He explained there will be a change on inter city bus route. Later on, bus is allowed passing Transjakarta bus lane and Jl. Lebak Bulus, RT 10/07 Pondok Pinang, Kebayoran Lama.

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye870 personTiyo Surya Sakti
  2. South Jakarta Tackles 38 Dengue Cases to Prevent Outbreak

    access_time02-02-2026 remove_red_eye465 personTiyo Surya Sakti
  3. TransJabodetabek Expansion, a Strategic Step to Increase Public Transportation Use

    access_time26-01-2026 remove_red_eye428 personFakhrizal Fakhri
  4. Jakarta Prepares OMC and 200 Excavators to Prevent Flood

    access_time26-01-2026 remove_red_eye372 personDessy Suciati
  5. Jakarta Showers to Make Way for Partly Cloudy Skies

    access_time30-01-2026 remove_red_eye361 personDessy Suciati
close