You don't have javascript enabled. Good luck with that.
Pencarian
Sudin SDA mulai Rapihkan Longsoran Turap

Damaged Sheet Pile on Jalan Jati Padang Repaired

South Jakarta Water Resources Sub-dept. is repairing a damaged sheet pile on Jalan Jati Padang Poncol, RT 06/08, Jati Padang, Pasar Minggu, which was eroded last Wednesday.

We send one excavator to clean up the chunks of erosion at the location

Based on the field report, sheet pile repair involves 20 freelancers of South Jakarta Water Resources Sub-dept. assisted by 30 PPSU officers.

Damaged Sheet Piles in Ciliwung will Be Repaired

South Jakarta Water Resources Sub-dept. Hili Susanto disclosed, sheet pile has 30 meters length and 3 meters height.

"We send one excavator to clean up the chunks of erosion at the location," he stated, Friday (4/14). 

He went on the say that it should be repaired in order to anticipate inundation.

"And then continued with repair using terracing method like soil in the rice fields area," he stated.

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye868 personTiyo Surya Sakti
  2. TransJabodetabek Expansion, a Strategic Step to Increase Public Transportation Use

    access_time26-01-2026 remove_red_eye424 personFakhrizal Fakhri
  3. Jakarta Prepares OMC and 200 Excavators to Prevent Flood

    access_time26-01-2026 remove_red_eye371 personDessy Suciati
  4. Jakarta Showers to Make Way for Partly Cloudy Skies

    access_time30-01-2026 remove_red_eye358 personDessy Suciati
  5. Several Microtrans Routes Diverted

    access_time31-01-2026 remove_red_eye355 personAldi Geri Lumban Tobing
close