You don't have javascript enabled. Good luck with that.
Pencarian
Sudin SDA mulai Rapihkan Longsoran Turap
.
photo Wuri Setyaningsih - Beritajakarta.id

Damaged Sheet Pile on Jalan Jati Padang Repaired

South Jakarta Water Resources Sub-dept. is repairing a damaged sheet pile on Jalan Jati Padang Poncol, RT 06/08, Jati Padang, Pasar Minggu, which was eroded last Wednesday.

We send one excavator to clean up the chunks of erosion at the location

Based on the field report, sheet pile repair involves 20 freelancers of South Jakarta Water Resources Sub-dept. assisted by 30 PPSU officers.

Damaged Sheet Piles in Ciliwung will Be Repaired

South Jakarta Water Resources Sub-dept. Hili Susanto disclosed, sheet pile has 30 meters length and 3 meters height.

"We send one excavator to clean up the chunks of erosion at the location," he stated, Friday (4/14). 

He went on the say that it should be repaired in order to anticipate inundation.

"And then continued with repair using terracing method like soil in the rice fields area," he stated.

Linked News
Popular News indeks
  1. Commission E Urges Residents to Increase Role in Preventing DHF

    access_time19-12-2024 remove_red_eye1221 personDessy Suciati
  2. Transjakarta Adjusting Service as Simpang Pramuka and Rawamangun Bus Stops Closed

    access_time18-12-2024 remove_red_eye1056 personAldi Geri Lumban Tobing
  3. Transjakarta, Telkomsel to Improve Service for Customers

    access_time19-12-2024 remove_red_eye911 personAldi Geri Lumban Tobing
  4. Acting Governor Monitors Food Stock at Kramat Jati and Cipinang Markets

    access_time19-12-2024 remove_red_eye737 personFolmer
  5. TMII Prepares Stuntman Show to Music Concert

    access_time23-12-2024 remove_red_eye701 personNurito