You don't have javascript enabled. Good luck with that.
Pencarian
Sudin SDA mulai Rapihkan Longsoran Turap
.
photo Wuri Setyaningsih - Beritajakarta.id

Damaged Sheet Pile on Jalan Jati Padang Repaired

South Jakarta Water Resources Sub-dept. is repairing a damaged sheet pile on Jalan Jati Padang Poncol, RT 06/08, Jati Padang, Pasar Minggu, which was eroded last Wednesday.

We send one excavator to clean up the chunks of erosion at the location

Based on the field report, sheet pile repair involves 20 freelancers of South Jakarta Water Resources Sub-dept. assisted by 30 PPSU officers.

Damaged Sheet Piles in Ciliwung will Be Repaired

South Jakarta Water Resources Sub-dept. Hili Susanto disclosed, sheet pile has 30 meters length and 3 meters height.

"We send one excavator to clean up the chunks of erosion at the location," he stated, Friday (4/14). 

He went on the say that it should be repaired in order to anticipate inundation.

"And then continued with repair using terracing method like soil in the rice fields area," he stated.

Linked News
Popular News indeks
  1. Transjakarta Targets Planting 100,000 Mangroves

    access_time12-07-2025 remove_red_eye393 personBudhi Firmansyah Surapati
  2. Rano Karno Celebrates City's Anniversary with Kamal Residents

    access_time12-07-2025 remove_red_eye389 personFolmer
  3. Residents Enthusiastically Enjoy the Car Free Day in Kebayoran Lama

    access_time13-07-2025 remove_red_eye349 personTiyo Surya Sakti
  4. Traffic Engineering on Jalan Otista to Begin July 20 Due to JPO Revitalization

    access_time17-07-2025 remove_red_eye322 personAldi Geri Lumban Tobing
  5. MRT Jakarta Considers Route Expansion to South Tangerang

    access_time13-07-2025 remove_red_eye315 personAldi Geri Lumban Tobing

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik