You don't have javascript enabled. Good luck with that.
Pencarian
Perbaikan Turap PHB Sadang 60 Persen, Turap PHB Gudang Baru Rampung

Sheet Pile of Gudang Baru Connecting Channel Finally Repaired

We have repaired it. This is our support toward development of RPTRA

South Jakarta Water Resources Sub-dept. finally has repaired the Gudang Baru Connecting Channel's sheet pile in Matoa RPTRA, Jagakarsa, South Jakarta.

"We have repaired it. This is our support toward development of RPTRA," expressed Firmansyah, Section Head of Maintenance for South Jakarta Water Resources Sub-dept., Friday (5/19).

Setu Channel's Sheet Pile in Ciganjur Repaired

According to him, sheet pile itself has 1.5-2 meters height with 250 meters length. It is repaired in order to ward off landslide in future.

"After doing this, the surroundings look neat and beautiful. Repair takes place about three months," he stated.

Besides that, the sub-dept. is also repairing another sheet pile as long as 200 meters in Jagakarsa Sub-district, namely Sada Connecting Channel on Jalan Purowa. Currently, its process has touched 60 percent.

Linked News
Popular News indeks
  1. 21 Parking Spots to Make Your Jakarta 499th Anniversary Experience Seamless

    access_time26-06-2026 remove_red_eye876 personAldi Geri Lumban Tobing
  2. Over 11 Kilometers of Overhead Utility Cables Removed in West Jakarta

    access_time26-06-2026 remove_red_eye793 personBudhi Firmansyah Surapati
  3. Celebrating Jakarta`s 499th Anniversary at HI, Please Use Public Transportation

    access_time26-06-2026 remove_red_eye724 personAldi Geri Lumban Tobing
  4. JIS-Ancol Integrated Infrastructure Officially Activated

    access_time23-06-2026 remove_red_eye656 personDessy Suciati
  5. 190 Satpol PP Personnel Deployed to Secure Jakarta Anniversary Celebration

    access_time26-06-2026 remove_red_eye596 personFolmer