You don't have javascript enabled. Good luck with that.
Pencarian
Perbaikan Turap PHB Sadang 60 Persen, Turap PHB Gudang Baru Rampung

Sheet Pile of Gudang Baru Connecting Channel Finally Repaired

We have repaired it. This is our support toward development of RPTRA

South Jakarta Water Resources Sub-dept. finally has repaired the Gudang Baru Connecting Channel's sheet pile in Matoa RPTRA, Jagakarsa, South Jakarta.

"We have repaired it. This is our support toward development of RPTRA," expressed Firmansyah, Section Head of Maintenance for South Jakarta Water Resources Sub-dept., Friday (5/19).

Setu Channel's Sheet Pile in Ciganjur Repaired

According to him, sheet pile itself has 1.5-2 meters height with 250 meters length. It is repaired in order to ward off landslide in future.

"After doing this, the surroundings look neat and beautiful. Repair takes place about three months," he stated.

Besides that, the sub-dept. is also repairing another sheet pile as long as 200 meters in Jagakarsa Sub-district, namely Sada Connecting Channel on Jalan Purowa. Currently, its process has touched 60 percent.

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye870 personTiyo Surya Sakti
  2. South Jakarta Tackles 38 Dengue Cases to Prevent Outbreak

    access_time02-02-2026 remove_red_eye486 personTiyo Surya Sakti
  3. TransJabodetabek Expansion, a Strategic Step to Increase Public Transportation Use

    access_time26-01-2026 remove_red_eye429 personFakhrizal Fakhri
  4. Jakarta Prepares OMC and 200 Excavators to Prevent Flood

    access_time26-01-2026 remove_red_eye372 personDessy Suciati
  5. Several Microtrans Routes Diverted

    access_time31-01-2026 remove_red_eye361 personAldi Geri Lumban Tobing
close