You don't have javascript enabled. Good luck with that.
Pencarian
Perbaikan Turap PHB Sadang 60 Persen, Turap PHB Gudang Baru Rampung
.
photo Wuri Setyaningsih - Beritajakarta.id

Sheet Pile of Gudang Baru Connecting Channel Finally Repaired

We have repaired it. This is our support toward development of RPTRA

South Jakarta Water Resources Sub-dept. finally has repaired the Gudang Baru Connecting Channel's sheet pile in Matoa RPTRA, Jagakarsa, South Jakarta.

"We have repaired it. This is our support toward development of RPTRA," expressed Firmansyah, Section Head of Maintenance for South Jakarta Water Resources Sub-dept., Friday (5/19).

Setu Channel's Sheet Pile in Ciganjur Repaired

According to him, sheet pile itself has 1.5-2 meters height with 250 meters length. It is repaired in order to ward off landslide in future.

"After doing this, the surroundings look neat and beautiful. Repair takes place about three months," he stated.

Besides that, the sub-dept. is also repairing another sheet pile as long as 200 meters in Jagakarsa Sub-district, namely Sada Connecting Channel on Jalan Purowa. Currently, its process has touched 60 percent.

Linked News
Popular News indeks
  1. Water Channel Dredging on Bendungan Melayu Reaches 50 Percent

    access_time18-09-2024 remove_red_eye828 personAnita Karyati
  2. Jakarta Leads Medal Standing at PON XXI

    access_time17-09-2024 remove_red_eye781 personFolmer
  3. Jakarta Aeromodelling Team Grabs First Gold Medal

    access_time16-09-2024 remove_red_eye556 personAldi Geri Lumban Tobing
  4. Area Arrangement on Jalan Kramat to Complete this Weekend

    access_time17-09-2024 remove_red_eye428 personTiyo Surya Sakti
  5. Area Arrangement on Jalan Setapak Reaches 95 Percent

    access_time14-09-2024 remove_red_eye363 personTiyo Surya Sakti