You don't have javascript enabled. Good luck with that.
Pencarian
Perbaikan Turap PHB Sadang 60 Persen, Turap PHB Gudang Baru Rampung
.
photo Wuri Setyaningsih - Beritajakarta.id

Sheet Pile of Gudang Baru Connecting Channel Finally Repaired

We have repaired it. This is our support toward development of RPTRA

South Jakarta Water Resources Sub-dept. finally has repaired the Gudang Baru Connecting Channel's sheet pile in Matoa RPTRA, Jagakarsa, South Jakarta.

"We have repaired it. This is our support toward development of RPTRA," expressed Firmansyah, Section Head of Maintenance for South Jakarta Water Resources Sub-dept., Friday (5/19).

Setu Channel's Sheet Pile in Ciganjur Repaired

According to him, sheet pile itself has 1.5-2 meters height with 250 meters length. It is repaired in order to ward off landslide in future.

"After doing this, the surroundings look neat and beautiful. Repair takes place about three months," he stated.

Besides that, the sub-dept. is also repairing another sheet pile as long as 200 meters in Jagakarsa Sub-district, namely Sada Connecting Channel on Jalan Purowa. Currently, its process has touched 60 percent.

Linked News
Popular News indeks
  1. Free Additional Nutritious Food Distributed to 31 Toddlers in Kalibata

    access_time13-09-2024 remove_red_eye1150 personTiyo Surya Sakti
  2. Jakarta Women's Football Team Ready to Face West Java at PON XXI Final

    access_time13-09-2024 remove_red_eye847 personFolmer
  3. Water Channel Dredging on Bendungan Melayu Reaches 50 Percent

    access_time18-09-2024 remove_red_eye828 personAnita Karyati
  4. Jakarta Leads Medal Standing at PON XXI

    access_time17-09-2024 remove_red_eye780 personFolmer
  5. PON XXI Temporary Standings: Jakarta Continues to Shadow East Java

    access_time13-09-2024 remove_red_eye759 personAldi Geri Lumban Tobing