You don't have javascript enabled. Good luck with that.
Pencarian
Lalu Lintas di Fly Over Kampung Melayu Ditutup

Kampung Melayu Flyover Is Closed

Jakarta Transportation Dept. has closed Kampung Melayu Flyover today, Thursday (5/25).

The National Police's Forensic Laboratory Center (Puslabfor) wants to do identification

According to Andri Yansyah, Head of Jakarta Transportation Dept., traffic closure aims to anticipate traffic jam and sterilization around Kampung Melayu Terminal, when police conduct on-site research.

Suicide Bomb at Kampung Melayu Terminal, Two Killed

"The National Police's Forensic Laboratory Center (Puslabfor) wants to do identification. Which is why we close until it's done," he disclosed.

Further, his dept. applies traffic engineering by directing vehicles from Jl. Abdullah Syafei towards Jl. Basuki Rahmat through under flyover to spin to Jl. Jatinegara Barat - Jl. Jatinegara Timur to return to Jl. Basuki Rahmat.

Otherwise, traffic from Jl. Basuki Rahmat towards Jl. Abdullah Syafei, will be rerouted to Jl. Otista and then go to Jl. Abdullah Syafei, precisely in front of Kampung Melayu Terminal.

To optimize it, 30 personnel of Jakarta Transportation Dept. have been deployed to the field. Then other personnel are also spread to some locations prone to traffic jam on the impact of such road closure.

"We don't know yet when it will run normally, as we're still awaiting the police to complete investigation process," he finished.

Linked News
Popular News indeks
  1. Jakarta Administration Steps Up Proactive Fire Prevention Efforts

    access_time09-10-2026 remove_red_eye441 personDessy Suciati
  2. Kramat Pulo Fire Survivors Get Help Replacing School Documents

    access_time09-10-2026 remove_red_eye366 personFolmer
  3. Moving Day, Apuran River Locals Clear Out for New Flood Pump

    access_time09-10-2026 remove_red_eye366 personBudhi Firmansyah Surapati
  4. 10,000 Participants Join People's Sports Festival at Velodrome

    access_time04-10-2026 remove_red_eye364 personNurito
  5. Kelapa Gading-Pulogadung Link Road Targeted for Completion in 2027

    access_time09-10-2026 remove_red_eye356 personDessy Suciati