You don't have javascript enabled. Good luck with that.
Pencarian
Waduk Ciawi-Sukamahi Kurangi 13 Persen Debit Air Ciliwung

Ciawi-Sukamahi Reservoir Targeted to Reduce Ciliwung Water Level

Ciawi-Sukamahi Reservoir construction in Bogor is targeted to reduce Ciliwung River water level. Land acquisition of these two reservoirs are now being accelerated by BBWSCC (Ciliwung-Cisadane Flood Control Office).

We predicted these two reservoirs could reduce 13 percent of water which flow to Ciliwung River

BWSCC Head, Teuku Iskandar said, these two reservoirs will be constructed to reduce water flow from Katulampa Dam into Ciliwung River.

"We predicted these two reservoirs could reduce 13 percent of water which flow to Ciliwung River," he said at City Hall, Tuesday (5/30).

Land Acquisition for Ciawi-Sukamahi Reservoir is Taken Over By Central Government

He also added, according to joint meeting, reservoirs construction project is taken over by his side, from its land acquisition to construction. Previously, reservoirs land acquisition was handled by Jakarta Provincial Government.

"Now, all works become central government responsibility. Recently, we are still inventorying land that will be freed, both in Ciawi and Sukamahi," he closed.

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye870 personTiyo Surya Sakti
  2. South Jakarta Tackles 38 Dengue Cases to Prevent Outbreak

    access_time02-02-2026 remove_red_eye491 personTiyo Surya Sakti
  3. TransJabodetabek Expansion, a Strategic Step to Increase Public Transportation Use

    access_time26-01-2026 remove_red_eye430 personFakhrizal Fakhri
  4. Jakarta Prepares OMC and 200 Excavators to Prevent Flood

    access_time26-01-2026 remove_red_eye373 personDessy Suciati
  5. Several Microtrans Routes Diverted

    access_time31-01-2026 remove_red_eye363 personAldi Geri Lumban Tobing
close