You don't have javascript enabled. Good luck with that.
Pencarian
Waduk Ciawi-Sukamahi Kurangi 13 Persen Debit Air Ciliwung

Ciawi-Sukamahi Reservoir Targeted to Reduce Ciliwung Water Level

Ciawi-Sukamahi Reservoir construction in Bogor is targeted to reduce Ciliwung River water level. Land acquisition of these two reservoirs are now being accelerated by BBWSCC (Ciliwung-Cisadane Flood Control Office).

We predicted these two reservoirs could reduce 13 percent of water which flow to Ciliwung River

BWSCC Head, Teuku Iskandar said, these two reservoirs will be constructed to reduce water flow from Katulampa Dam into Ciliwung River.

"We predicted these two reservoirs could reduce 13 percent of water which flow to Ciliwung River," he said at City Hall, Tuesday (5/30).

Land Acquisition for Ciawi-Sukamahi Reservoir is Taken Over By Central Government

He also added, according to joint meeting, reservoirs construction project is taken over by his side, from its land acquisition to construction. Previously, reservoirs land acquisition was handled by Jakarta Provincial Government.

"Now, all works become central government responsibility. Recently, we are still inventorying land that will be freed, both in Ciawi and Sukamahi," he closed.

Linked News
Popular News indeks
  1. Jakarta Taps MSMEs and Creative Economy to Secure Global Top 50 Spot

    access_time11-07-2026 remove_red_eye1590 personAldi Geri Lumban Tobing
  2. Ciliwung River Normalization Accelerated, Pramono Ensures Land Acquisition Without Intermediaries

    access_time10-07-2026 remove_red_eye1440 personDessy Suciati
  3. Blocked Drain on Jalan Palmerah Utara is Being Repaired

    access_time10-07-2026 remove_red_eye1304 personFolmer
  4. Pramono Inaugurates Mayapada Hospital to Improve Healthcare Services

    access_time09-07-2026 remove_red_eye967 personDessy Suciati
  5. MRT Phase 2A Northbound Tunnel Excavation Completed

    access_time09-07-2026 remove_red_eye845 personAldi Geri Lumban Tobing