You don't have javascript enabled. Good luck with that.
Pencarian
 Sudin SDA Lanjutkan Pengerjaan Saluran Air di Jl Lodan Raya

Channel Construction on Jalan Lodan Raya Re-continued

North Jakarta Water Resources Sub-dept. is re-continuing water channel project on Jalan Lodan Raya, RW 06, Ancol Urban Village, Pademangan Sub-district. It is conducted to minimize puddles when it rains.

It's a follow up project done around mid-April 2017 ago. This is done to minimize puddles when rain and rob occur

Pademangan Sub-district Head, Mumu Mujtahid said the project itself is started from Lodan Raya until bridge, with 250 meters length, 1 meter width and 1 meter depth.

"It's a follow up project done around mid-April 2017 ago. This is done to minimize puddles when rain and rob occur," he expressed, Thursday (7/13).

Drainpipe Installed at Cawang Tunnel to Minimize Puddles

His side has prepared 10 freelancers of North Jakarta Water Resources Sub-dept. to conduct the project.

 

"It's predicted to be finished by the end of this month," he closed.

Linked News
Popular News indeks
  1. Pramono Affirms Commitment to Enhancing Regional Financial Management Quality

    access_time02-04-2026 remove_red_eye790 personTiyo Surya Sakti
  2. Pramono Calls for Enhanced Synergy at DPRD Post-Eid Gathering

    access_time30-03-2026 remove_red_eye697 personDessy Suciati
  3. Banners Prohibiting Illegal Parking Levies Installed at Blok M Square

    access_time02-04-2026 remove_red_eye636 personTiyo Surya Sakti
  4. Kampung Rambutan Terminal Sees Increase in Intercity Bus Passengers

    access_time03-04-2026 remove_red_eye548 personNurito
  5. Gov Pramono: Jakarta Prepared to Adopt Weekly WFH Scheme

    access_time30-03-2026 remove_red_eye444 personDessy Suciati