You don't have javascript enabled. Good luck with that.
Pencarian
Semarakan HUT RI, Jakut Dipercantik dengan Lampu Hias

500 Ornamental Lamps Installed in N. Jakarta to Enliven 72nd Independence Day

North Jakarta Industry and Energy Sub-dept. has installed 500 ornamental lamps to enliven the 72nd Independence Day anniversary. The lamps will be installed at some points.

We've installed 500 ornamental lamps. Its installation is focused on protocol roads and mayor offices

"We've installed 500 ornamental lamps. Its installation is focused on protocol roads and mayor offices," said Raden Agus Mulyadi, Head of North Jakarta Industry and Energy Sub-dept., Tuesday (8/15).

According to him, a number of lamps are installed on the the front yard of the mayor's office and Jalan Perintis Kemerdekaan, Jalan Yos Sudarso, Jalan Pluit Timur and some points.

N. Jakarta to Celebrate Independence Day at BMW Park

Then for types of lamps installed are strip LED, meteor light, neon box, etc. Each lamp has 40-90 watts power.

"Especially for LED lamp, it is installed on the big trees alongside protocol road," he closed.

Linked News
Popular News indeks
  1. Volcanic Ash Reaches Jakarta, Health Agency Calls for Protective Measures

    access_time06-09-2026 remove_red_eye1413 personBudhi Firmansyah Surapati
  2. Jakartans Urged to Stay Calm and Take Precautions Amid Mt. Anak Krakatau Volcanic Ash

    access_time06-09-2026 remove_red_eye724 personBudhi Firmansyah Surapati
  3. JITEX 2026: Fostering a Global Trade and Investment Ecosystem

    access_time01-09-2026 remove_red_eye619 personAldi Geri Lumban Tobing
  4. Jakarta Provincial Government Anticipates the Impact of Volcanic Ash from Mount Anak Krakatau

    access_time06-09-2026 remove_red_eye580 personFolmer
  5. Jakarta BPBD Urges Residents to Prepare for Meteorological Drought

    access_time04-09-2026 remove_red_eye545 personAldi Geri Lumban Tobing