You don't have javascript enabled. Good luck with that.
Pencarian
 Tujuh Pompa Air di Jakpus Diservice

Pumps Maintenance in Central Jakarta Has Reached 90 Percent

Around eight pumps in Central Jakarta are under maintainance. It is targeted to be completed in the forthcoming September.

Each pump has different suction power. There is one pump can suck up 500-1,000 cubic liters

"Those pumps are located at seven locations. Maintenance itself has been ongoing since last July, and now it has touched 90 percent," expressed Boris Karlop Lumbangaol, Section Head of Channel Maintenance and Treatment for Central Jakarta Water Resources Sub-dept., Monday (8/28).

The eight pumps are two units of Jaya Building, one unit of Mapalus Building, one unit of Jalan Rajawali Selatan, one unit of Dwiwarna, one unit of Sumur Batu and one unit of Jalan Cempaka Baru.

Two Water Pumps Prepared to Handle Inundation on Jl. Ancol Selatan

"Each pump has different suction power. There is one pump can suck up 500-1,000 cubic liters," he told.

Actually, he furthered, there is no significant malfunction to the pump. However, maintenance is done on several components and must be cleaned.

"The cleaning of the propeller components is the main one, as there is often a lot of garbage that gets stuck, which makes the engine work harder and can cause malfunction," he closed.

Linked News
Popular News indeks
  1. Jakarta Deploys 120 Personnel to Counteract Traffic Disruption for Today’s Protests

    access_time27-08-2026 remove_red_eye783 personAldi Geri Lumban Tobing
  2. Transjakarta Resumes Operations with Strategic Service Adjustments

    access_time28-08-2026 remove_red_eye772 personAldi Geri Lumban Tobing
  3. Rano: CIEIE 2026 to Catapult Jakarta’s MSMEs onto the International Stage

    access_time25-08-2026 remove_red_eye768 personBudhi Firmansyah Surapati
  4. JIF Summit 2026 Drives Global Partnerships and Investment Growth in Jakarta

    access_time28-08-2026 remove_red_eye617 personAldi Geri Lumban Tobing
  5. Drainage Normalization on Jalan Mandioli to Be Completed in October

    access_time28-08-2026 remove_red_eye457 personFolmer