You don't have javascript enabled. Good luck with that.
Pencarian
PJU di Kali Cempaka Putih Tengah akan Dipasang
.
photo Wuri Setyaningsih - Beritajakarta.id

Streetlights will Be Installed in Cempaka Putih Tengah Riverbank

Central Jakarta Industry and Energy (PE) Sub-dept. will install streetlights (PJU) in Cempaka Putih Tengah riverbank. It is hoped with enough lighting, it could make residents feel safer.

Installation is done by applying 30 meters-distance for each lamps

"Installation is done by applying 30 meters-distance for each lamps as long as six kilometers on both sides. While streetlight pole has 6 meters tall," said Iswandi, head of Central Jakarta Industry and Energy Sub-dept., Thursday (9/7).

According to him, 116 LED lamps with capacity 90 watts have been prepared. Its pole foundation is currently being made.

28,001 PJU Lamps Replaced With LED

"This project is conducted by auction system. It is targeted to finish on December 15," he closed.

Linked News
Popular News indeks
  1. Commission E Urges Residents to Increase Role in Preventing DHF

    access_time19-12-2024 remove_red_eye1221 personDessy Suciati
  2. Transjakarta Adjusting Service as Simpang Pramuka and Rawamangun Bus Stops Closed

    access_time18-12-2024 remove_red_eye1056 personAldi Geri Lumban Tobing
  3. First Jakarta Update Talks Nataru up to Water Tariff Adjustment

    access_time24-12-2024 remove_red_eye922 personDessy Suciati
  4. Transjakarta, Telkomsel to Improve Service for Customers

    access_time19-12-2024 remove_red_eye911 personAldi Geri Lumban Tobing
  5. Acting Governor Monitors Food Stock at Kramat Jati and Cipinang Markets

    access_time19-12-2024 remove_red_eye737 personFolmer