You don't have javascript enabled. Good luck with that.
Pencarian
Breakwater di Pulau Panggang di Perbaiki

Breakwater in Panggang Island Repaired

12 personnel from Seribu Islands Water Resources (SDA) Dept. repair breakwater on the north side of Panggang Island. The repair is targeted to complete by the end of October.

We evaluate cubes arrangement to strengthen the embankment. Because recently high waves are often appears

Seribu Islands Water Resources Dept. Head, Ahmad Saiful said, these two days his side has repair the broken embankment on the north side of Panggang Island due to hit by east wind waves in last August.

"There are five damaged breakwater locations, which has length around 400 meters. Personnel has started to compile disorganized cubes within this two days," he explained, Thursday (9/14).

Breakwater on East Side of Panggang Island Repaired

He said, his side repairs it by rearranging the cubes and switches the arrangement pattern from 432 pattern into pyramid pattern. His side hopes this pattern is more stronger to block high waves.

"We evaluate cubes arrangement to strengthen the embankment. Because recently high waves are often appears. It is targeted to finish this October," he closed.

Linked News
Popular News indeks
  1. Transjakarta Resumes Operations with Strategic Service Adjustments

    access_time28-08-2026 remove_red_eye948 personAldi Geri Lumban Tobing
  2. JIF Summit 2026 Drives Global Partnerships and Investment Growth in Jakarta

    access_time28-08-2026 remove_red_eye670 personAldi Geri Lumban Tobing
  3. Transjakarta Commits to Accelerating Modal Integration and Fleet Electrification

    access_time31-08-2026 remove_red_eye548 personAldi Geri Lumban Tobing
  4. JITEX 2026: Fostering a Global Trade and Investment Ecosystem

    access_time01-09-2026 remove_red_eye546 personAldi Geri Lumban Tobing
  5. Drainage Normalization on Jalan Mandioli to Be Completed in October

    access_time28-08-2026 remove_red_eye493 personFolmer