You don't have javascript enabled. Good luck with that.
Pencarian
Sudin Bina Marga Perbaiki Railing JPO di Kali Keronconv

Eight Railings of JPO in Keroncong Menteng River Improved

Three damaged railings are welded. All railings will be painted, so it can look more beautiful

Central Jakarta Bina Marga Sub-dept. is repairing eight railings of the pedestrian bridge (JPO) in the Keroncong River flows, in Menteng Sub-district. It is targeted can be completed in the upcoming November.

"There are totally nine bridges along Keroncong River, Menteng. But we just need to repair eight with total length of the bridge is 222,40 meters," expressed Sukowibowo, Head of Central Jakarta Bina Marga Sub-dept., Monday (9/25).

Billboards in Three Crossing Bridges will Be Controlled

Of eight bridges, five out of them have no railing thus new railing must be made.

"Three damaged railings are welded. All railings will be painted, so it can look more beautiful," he stated.

Linked News
Popular News indeks
  1. Jakarta Govt-City Council Step Up Coordination to Address Key Urban Challenges

    access_time22-02-2026 remove_red_eye1166 personFakhrizal Fakhri
  2. Transjakarta Brings Lunar New Year Festivities to Public Transport

    access_time16-02-2026 remove_red_eye995 personAldi Geri Lumban Tobing
  3. Free Transit Card Applications Skyrocket 143%, Passing 76k Mark

    access_time20-02-2026 remove_red_eye953 personAldi Geri Lumban Tobing
  4. Public Works Agency Gets Transjakarta Corridor 13 Back in Tip-Top Shape

    access_time17-02-2026 remove_red_eye731 personAldi Geri Lumban Tobing
  5. Chinese New Year Holiday, Ancol Flocked by Visitors

    access_time16-02-2026 remove_red_eye630 personAnita Karyati