You don't have javascript enabled. Good luck with that.
Pencarian
Sudin Bina Marga Perbaiki Railing JPO di Kali Keronconv

Eight Railings of JPO in Keroncong Menteng River Improved

Three damaged railings are welded. All railings will be painted, so it can look more beautiful

Central Jakarta Bina Marga Sub-dept. is repairing eight railings of the pedestrian bridge (JPO) in the Keroncong River flows, in Menteng Sub-district. It is targeted can be completed in the upcoming November.

"There are totally nine bridges along Keroncong River, Menteng. But we just need to repair eight with total length of the bridge is 222,40 meters," expressed Sukowibowo, Head of Central Jakarta Bina Marga Sub-dept., Monday (9/25).

Billboards in Three Crossing Bridges will Be Controlled

Of eight bridges, five out of them have no railing thus new railing must be made.

"Three damaged railings are welded. All railings will be painted, so it can look more beautiful," he stated.

Linked News
Popular News indeks
  1. Pram-Rano Attend Bung Karno Festival at Proklamasi Park

    access_time20-06-2026 remove_red_eye1098 personFolmer
  2. JIS-Ancol Integrated Infrastructure Officially Activated

    access_time23-06-2026 remove_red_eye581 personDessy Suciati
  3. Jakarta Steps Up to the Plate as PON 2028’s Support System

    access_time24-06-2026 remove_red_eye530 personFakhrizal Fakhri
  4. Jakarta Light Festival Dazzles Visitors at Kota Tua

    access_time22-06-2026 remove_red_eye512 personBudhi Firmansyah Surapati
  5. Free Cake-Making Training Held at RPTRA Mustika Ratu

    access_time23-06-2026 remove_red_eye508 personNurito