You don't have javascript enabled. Good luck with that.
Pencarian
Sudin Bina Marga Perbaiki Railing JPO di Kali Keronconv

Eight Railings of JPO in Keroncong Menteng River Improved

Three damaged railings are welded. All railings will be painted, so it can look more beautiful

Central Jakarta Bina Marga Sub-dept. is repairing eight railings of the pedestrian bridge (JPO) in the Keroncong River flows, in Menteng Sub-district. It is targeted can be completed in the upcoming November.

"There are totally nine bridges along Keroncong River, Menteng. But we just need to repair eight with total length of the bridge is 222,40 meters," expressed Sukowibowo, Head of Central Jakarta Bina Marga Sub-dept., Monday (9/25).

Billboards in Three Crossing Bridges will Be Controlled

Of eight bridges, five out of them have no railing thus new railing must be made.

"Three damaged railings are welded. All railings will be painted, so it can look more beautiful," he stated.

Linked News
Popular News indeks
  1. Jakarta Council Begins Deliberations on New Population and Housing Bylaws

    access_time21-08-2026 remove_red_eye1933 personFakhrizal Fakhri
  2. Pramono Vows to Prioritize Jakarta’s Strategic Development

    access_time22-08-2026 remove_red_eye1026 personDessy Suciati
  3. Rano: CIEIE 2026 to Catapult Jakarta’s MSMEs onto the International Stage

    access_time25-08-2026 remove_red_eye720 personBudhi Firmansyah Surapati
  4. Pramono Pushes for Partnership Between New Toto Tentrem and Tarakan Hospitals

    access_time24-08-2026 remove_red_eye640 personDessy Suciati
  5. New LRT Jakarta Route Set for Official Launch on August 26

    access_time22-08-2026 remove_red_eye501 personDessy Suciati