You don't have javascript enabled. Good luck with that.
Pencarian
Kena Proyek MRT, Tiga Bidang Lahan di Cilandak Ditata Pemkot Jaksel
.
photo TP Moan Simanjuntak - Beritajakarta.id

MRT Project in South Jakarta Accelerated

South Jakarta Administration began to speed up the construction of mass rapid transit (MRT) Jakarta by arranging three plots of lands and buildings. These land and building located in Cilandak Sub-district have been acquired.

Today the arrangement is carried out

South Jakarta Mayor, Tri Kurniadi said arrangement is conducted to speed up the MRT construction that will be used as Cipete Raya MRT Station.

"Today the arrangement is carried out," he stated, Thursday (9/28). 

PT MRT Tasked to Make BED for Arrangement of Sudirman-Thamrin Sidewalk

South Jakarta Law Section Head, TP Purba expressed those plots are map land number 354 and 348.1 in Cipete Selatan Urban Village and land number 341 in Gandaria Selatan Urban Village, Cilandak Sub-district.

"Total width of the land arranged is 151 square meters. Arrangement itself runs safe and conducive," he closed.

Linked News
Popular News indeks
  1. Commission D Legislator Supports Park Monitoring Optimization

    access_time20-01-2025 remove_red_eye1505 personDessy Suciati
  2. Realizing Food Self-Sufficiency, Jakarta Holds Simultaneous Planting Activity

    access_time21-01-2025 remove_red_eye927 personAldi Geri Lumban Tobing
  3. Gulkarmat to Intensify Fire Mitigation Education

    access_time22-01-2025 remove_red_eye397 personBudhi Firmansyah Surapati
  4. City and Kejati Forge Cooperation for Good Government Governance

    access_time21-01-2025 remove_red_eye393 personFolmer
  5. BMKG Warns of Potential High Rainfall in Jakarta

    access_time22-01-2025 remove_red_eye393 personDessy Suciati