You don't have javascript enabled. Good luck with that.
Pencarian
Kena Proyek MRT, Tiga Bidang Lahan di Cilandak Ditata Pemkot Jaksel
.
photo TP Moan Simanjuntak - Beritajakarta.id

MRT Project in South Jakarta Accelerated

South Jakarta Administration began to speed up the construction of mass rapid transit (MRT) Jakarta by arranging three plots of lands and buildings. These land and building located in Cilandak Sub-district have been acquired.

Today the arrangement is carried out

South Jakarta Mayor, Tri Kurniadi said arrangement is conducted to speed up the MRT construction that will be used as Cipete Raya MRT Station.

"Today the arrangement is carried out," he stated, Thursday (9/28). 

PT MRT Tasked to Make BED for Arrangement of Sudirman-Thamrin Sidewalk

South Jakarta Law Section Head, TP Purba expressed those plots are map land number 354 and 348.1 in Cipete Selatan Urban Village and land number 341 in Gandaria Selatan Urban Village, Cilandak Sub-district.

"Total width of the land arranged is 151 square meters. Arrangement itself runs safe and conducive," he closed.

Linked News
Popular News indeks
  1. Deputy Gov Rano: Meat Stocks Secured Up to Ramadhan

    access_time22-02-2025 remove_red_eye554 personBudhi Firmansyah Surapati
  2. Jakarta to Hold Cheap Food Bazaar at 193 Locations

    access_time22-02-2025 remove_red_eye446 personBudhi Firmansyah Surapati
  3. Pramono - Rano Expected to Realize Better Resident Welfare

    access_time20-02-2025 remove_red_eye309 personBudhi Firmansyah Surapati
  4. Jakartans Invited to Participate in HPSN 2025 Event

    access_time21-02-2025 remove_red_eye301 personAldi Geri Lumban Tobing
  5. 41 Wild Cats in Cikoko Sterilized

    access_time21-02-2025 remove_red_eye295 personTiyo Surya Sakti