You don't have javascript enabled. Good luck with that.
Pencarian
Kena Proyek MRT, Tiga Bidang Lahan di Cilandak Ditata Pemkot Jaksel

MRT Project in South Jakarta Accelerated

South Jakarta Administration began to speed up the construction of mass rapid transit (MRT) Jakarta by arranging three plots of lands and buildings. These land and building located in Cilandak Sub-district have been acquired.

Today the arrangement is carried out

South Jakarta Mayor, Tri Kurniadi said arrangement is conducted to speed up the MRT construction that will be used as Cipete Raya MRT Station.

"Today the arrangement is carried out," he stated, Thursday (9/28). 

PT MRT Tasked to Make BED for Arrangement of Sudirman-Thamrin Sidewalk

South Jakarta Law Section Head, TP Purba expressed those plots are map land number 354 and 348.1 in Cipete Selatan Urban Village and land number 341 in Gandaria Selatan Urban Village, Cilandak Sub-district.

"Total width of the land arranged is 151 square meters. Arrangement itself runs safe and conducive," he closed.

Linked News
Popular News indeks
  1. Rano Reaffirms Jakarta's Vision of Becoming a City of Cinema

    access_time22-10-2026 remove_red_eye5480 personBudhi Firmansyah Surapati
  2. Jakarta Provincial Government Receives a Grant of Rp 9.6 Billion in KPK`s Seized Assets

    access_time20-10-2026 remove_red_eye4617 personDessy Suciati
  3. Drainage Channels Along Two Rawajati Roads Dredged

    access_time21-10-2026 remove_red_eye1823 personTiyo Surya Sakti
  4. Jakarta Esports 2026: Celebrating Local Games, Music and More

    access_time19-10-2026 remove_red_eye1022 personAldi Geri Lumban Tobing
  5. Jakarta Pushed for Education Equity to Retain Top Student City Rank

    access_time19-10-2026 remove_red_eye1018 personFakhrizal Fakhri