You don't have javascript enabled. Good luck with that.
Pencarian
Kena Proyek MRT, Tiga Bidang Lahan di Cilandak Ditata Pemkot Jaksel

MRT Project in South Jakarta Accelerated

South Jakarta Administration began to speed up the construction of mass rapid transit (MRT) Jakarta by arranging three plots of lands and buildings. These land and building located in Cilandak Sub-district have been acquired.

Today the arrangement is carried out

South Jakarta Mayor, Tri Kurniadi said arrangement is conducted to speed up the MRT construction that will be used as Cipete Raya MRT Station.

"Today the arrangement is carried out," he stated, Thursday (9/28). 

PT MRT Tasked to Make BED for Arrangement of Sudirman-Thamrin Sidewalk

South Jakarta Law Section Head, TP Purba expressed those plots are map land number 354 and 348.1 in Cipete Selatan Urban Village and land number 341 in Gandaria Selatan Urban Village, Cilandak Sub-district.

"Total width of the land arranged is 151 square meters. Arrangement itself runs safe and conducive," he closed.

Linked News
Popular News indeks
  1. Pram-Rano Attend Bung Karno Festival at Proklamasi Park

    access_time20-06-2026 remove_red_eye1113 personFolmer
  2. JIS-Ancol Integrated Infrastructure Officially Activated

    access_time23-06-2026 remove_red_eye594 personDessy Suciati
  3. Jakarta Steps Up to the Plate as PON 2028’s Support System

    access_time24-06-2026 remove_red_eye547 personFakhrizal Fakhri
  4. Jakarta Light Festival Dazzles Visitors at Kota Tua

    access_time22-06-2026 remove_red_eye538 personBudhi Firmansyah Surapati
  5. Free Cake-Making Training Held at RPTRA Mustika Ratu

    access_time23-06-2026 remove_red_eye519 personNurito