You don't have javascript enabled. Good luck with that.
Pencarian
Kena Proyek MRT, Tiga Bidang Lahan di Cilandak Ditata Pemkot Jaksel
.
photo TP Moan Simanjuntak - Beritajakarta.id

MRT Project in South Jakarta Accelerated

South Jakarta Administration began to speed up the construction of mass rapid transit (MRT) Jakarta by arranging three plots of lands and buildings. These land and building located in Cilandak Sub-district have been acquired.

Today the arrangement is carried out

South Jakarta Mayor, Tri Kurniadi said arrangement is conducted to speed up the MRT construction that will be used as Cipete Raya MRT Station.

"Today the arrangement is carried out," he stated, Thursday (9/28). 

PT MRT Tasked to Make BED for Arrangement of Sudirman-Thamrin Sidewalk

South Jakarta Law Section Head, TP Purba expressed those plots are map land number 354 and 348.1 in Cipete Selatan Urban Village and land number 341 in Gandaria Selatan Urban Village, Cilandak Sub-district.

"Total width of the land arranged is 151 square meters. Arrangement itself runs safe and conducive," he closed.

Linked News
Popular News indeks
  1. 104 Wild Cats in Kebayoran Lama Sterilized

    access_time07-11-2024 remove_red_eye804 personTiyo Surya Sakti
  2. W. Jakarta SDA Constructs Channel on Jalan Nurul Muslimin I Kembangan

    access_time04-11-2024 remove_red_eye790 personTP Moan Simanjuntak
  3. Semongol River Dredging Intensified

    access_time06-11-2024 remove_red_eye343 personTP Moan Simanjuntak
  4. Pembangunan Jaya Ancol Wins CSA Awards 2024

    access_time06-11-2024 remove_red_eye315 personAldi Geri Lumban Tobing
  5. Juaini Appreciates Public Services in Rawa Badak Utara Urban Village

    access_time07-11-2024 remove_red_eye302 personBudhi Firmansyah Surapati