You don't have javascript enabled. Good luck with that.
Pencarian
PAL Jaya Olah Limbah Tinja di IPLT Pulogebang

PD PAL Jaya Processes Stool Waste Through Pulogebang IPLT

PD PAL Jaya is conducting stool waste processing at Pulogebang Waste Treatment Plant (IPLT), Cakung, East Jakarta.

Within one day, 900 cubic meters of stool waste can be processed

PD PAL Jaya President Director, Suberkti expressed, every day, 75 fleets of trucks from locals are alerted to Pulogebang IPLT.

"Within one day, 900 cubic meters of stool waste can be processed," he stated, Thursday (10/5).

PD PAL Jaya Intensifies Use of Bio PAL

He details, 300 cubic meters of stool waste are processed conventionally and 600 more cubic processed using mechanical systems.

"Based on the results of processing, there are two namely, solid and liquid. For the liquid waste that has been processed is flowed back to the river, while solid waste will be used for briquette and non-food crop fertilizer," he stated.

He added the number of Pulogebang IPLT employees is reaching 25 people, consisting of security officers, freelancers and personnel section.

"We continue to develop the results of waste processing to be economically valuable and beneficial to the people," he closed.

Linked News
Popular News indeks
  1. Suckermouth Catfish Control for Environmental Preservation

    access_time18-04-2026 remove_red_eye788 personFakhrizal Fakhri
  2. Jakarta to Hold Citywide Lights-Out Initiative

    access_time24-04-2026 remove_red_eye636 personAldi Geri Lumban Tobing
  3. Suckerfish Handling in South Jakarta is Run in Accordance with MUI Recommendations

    access_time21-04-2026 remove_red_eye627 personTiyo Surya Sakti
  4. Jakarta Newcomers Mostly in Productive Age

    access_time22-04-2026 remove_red_eye386 personAldi Geri Lumban Tobing
  5. East Jakarta Steps Up Services to Simplify Population Registration

    access_time20-04-2026 remove_red_eye361 personNurito