You don't have javascript enabled. Good luck with that.
Pencarian
Pengerjaan LRT Koridor 1 sudah mencapai 37%

LRT Phase 1 Construction Reaches 37 Percent

Light Rail Transit (LRT) phase 1 infrastructure construction for Kelapa Gading-Velodrome Rawamangun is one of Asian Games support facilities and now its process reaches 37 percent.

Until now, 660 girder boxes and 40 spans have been installed

PT. Jakarta Propertindo (Jakpro) Secretary, Erry Gunari Prakasa said LRT phase 1 route has 5.8 kilometers long.

"Until now, 660 girder boxes and 40 spans have been installed. Budget absorption reaches Rp 1.3 trillion or 20 percent from total budget Rp 6.8 trillion," he said, Wednesday (10/11).

PT. Jakpro Asked to Make Analysis Regarding LRT Route Extension

He explained, LRT Phase 1 will pass through six stations; Depo Pegangsaan Dua Station, station in front of Kelapa Gading Mal, Station on Jl. Boulevard Raya Kelapa Gading, station on Jl. Kayu Putih Raya (Pulomas), station on Jl. Kayu Putih Raya (Equestrian), and station infront of Rawamangun Velodrome Sport Center.

"We plan to install 5.8 kilometers rail by the end of this year," he expressed.

He added, PT. Jakpro has prepared 16 train cars to be shipped in April 2018 for LRT operational.

"We estimate 13 thousand passengers will use this mass transportation service in a day," he closed. 

Linked News
Popular News indeks
  1. Pram-Rano Attend Bung Karno Festival at Proklamasi Park

    access_time20-06-2026 remove_red_eye1115 personFolmer
  2. JIS-Ancol Integrated Infrastructure Officially Activated

    access_time23-06-2026 remove_red_eye599 personDessy Suciati
  3. Jakarta Steps Up to the Plate as PON 2028’s Support System

    access_time24-06-2026 remove_red_eye551 personFakhrizal Fakhri
  4. Jakarta Light Festival Dazzles Visitors at Kota Tua

    access_time22-06-2026 remove_red_eye540 personBudhi Firmansyah Surapati
  5. Free Cake-Making Training Held at RPTRA Mustika Ratu

    access_time23-06-2026 remove_red_eye523 personNurito