You don't have javascript enabled. Good luck with that.
Pencarian
Proyek Filtrasi Kali Besar Terus Dikebut

Kali Besar Filtration Project Accelerated

The Kali Besar filtration project at Kota Tua, Taman Sari, West Jakarta is accelerated. It is targeted the project to finish by the end of this year.

We're optimistic Kali Besar revitalization project to finish by the end of this year

West Jakarta Economy and Development Assistant, Fredy Setiawan, said filtration engine box will be developed by this week. It is placed under Asemka Flyover.

"The area has been flattened. Now we are still waiting the engine," he said, Monday (10/16).

Yos Sudarso 1 Pump House Equipped With 3 Rotary Screens

According to him, contractor has targeted to finish the engine installation by this month.

"We're optimistic Kali Besar revitalization project to finish by the end of this year. Citizens are able to enjoy the revitalization area as their new tourism site," he closed.

Linked News
Popular News indeks
  1. Suckermouth Catfish Control for Environmental Preservation

    access_time18-04-2026 remove_red_eye788 personFakhrizal Fakhri
  2. Suckerfish Handling in South Jakarta is Run in Accordance with MUI Recommendations

    access_time21-04-2026 remove_red_eye626 personTiyo Surya Sakti
  3. Jakarta to Hold Citywide Lights-Out Initiative

    access_time24-04-2026 remove_red_eye623 personAldi Geri Lumban Tobing
  4. Jakarta Newcomers Mostly in Productive Age

    access_time22-04-2026 remove_red_eye386 personAldi Geri Lumban Tobing
  5. East Jakarta Steps Up Services to Simplify Population Registration

    access_time20-04-2026 remove_red_eye361 personNurito