You don't have javascript enabled. Good luck with that.
Pencarian
Proyek Filtrasi Kali Besar Terus Dikebut

Kali Besar Filtration Project Accelerated

The Kali Besar filtration project at Kota Tua, Taman Sari, West Jakarta is accelerated. It is targeted the project to finish by the end of this year.

We're optimistic Kali Besar revitalization project to finish by the end of this year

West Jakarta Economy and Development Assistant, Fredy Setiawan, said filtration engine box will be developed by this week. It is placed under Asemka Flyover.

"The area has been flattened. Now we are still waiting the engine," he said, Monday (10/16).

Yos Sudarso 1 Pump House Equipped With 3 Rotary Screens

According to him, contractor has targeted to finish the engine installation by this month.

"We're optimistic Kali Besar revitalization project to finish by the end of this year. Citizens are able to enjoy the revitalization area as their new tourism site," he closed.

Linked News
Popular News indeks
  1. Transjakarta Brings Lunar New Year Festivities to Public Transport

    access_time16-02-2026 remove_red_eye974 personAldi Geri Lumban Tobing
  2. Free Transit Card Applications Skyrocket 143%, Passing 76k Mark

    access_time20-02-2026 remove_red_eye934 personAldi Geri Lumban Tobing
  3. Jakarta Govt-City Council Step Up Coordination to Address Key Urban Challenges

    access_time22-02-2026 remove_red_eye836 personFakhrizal Fakhri
  4. Public Works Agency Gets Transjakarta Corridor 13 Back in Tip-Top Shape

    access_time17-02-2026 remove_red_eye710 personAldi Geri Lumban Tobing
  5. Chinese New Year Holiday, Ancol Flocked by Visitors

    access_time16-02-2026 remove_red_eye608 personAnita Karyati