You don't have javascript enabled. Good luck with that.
Pencarian
Proyek Filtrasi Kali Besar Terus Dikebut

Kali Besar Filtration Project Accelerated

The Kali Besar filtration project at Kota Tua, Taman Sari, West Jakarta is accelerated. It is targeted the project to finish by the end of this year.

We're optimistic Kali Besar revitalization project to finish by the end of this year

West Jakarta Economy and Development Assistant, Fredy Setiawan, said filtration engine box will be developed by this week. It is placed under Asemka Flyover.

"The area has been flattened. Now we are still waiting the engine," he said, Monday (10/16).

Yos Sudarso 1 Pump House Equipped With 3 Rotary Screens

According to him, contractor has targeted to finish the engine installation by this month.

"We're optimistic Kali Besar revitalization project to finish by the end of this year. Citizens are able to enjoy the revitalization area as their new tourism site," he closed.

Linked News
Popular News indeks
  1. BMKG: Sunny to Cloudy Skies Forecast Across Jakarta Today

    access_time11-09-2026 remove_red_eye1695 personDessy Suciati
  2. Jakarta Reallocates Funds for Rp 250M Suckermouth Catfish Study After Pramono’s Direct Order

    access_time10-09-2026 remove_red_eye681 personFakhrizal Fakhri
  3. Jakarta Swift Response to Volcanic Ash Helps Narrow Areas with High PM10

    access_time08-09-2026 remove_red_eye491 personAldi Geri Lumban Tobing
  4. Pramono Urges Jakmania to Keep Jakarta Safe

    access_time11-09-2026 remove_red_eye443 personDessy Suciati
  5. Pramono Endorses Five-City Tour for Jazz Goes to Campus

    access_time12-09-2026 remove_red_eye423 personDessy Suciati