You don't have javascript enabled. Good luck with that.
Pencarian
Proyek Filtrasi Kali Besar Terus Dikebut
.
photo Folmer - Beritajakarta.id

Kali Besar Filtration Project Accelerated

The Kali Besar filtration project at Kota Tua, Taman Sari, West Jakarta is accelerated. It is targeted the project to finish by the end of this year.

We're optimistic Kali Besar revitalization project to finish by the end of this year

West Jakarta Economy and Development Assistant, Fredy Setiawan, said filtration engine box will be developed by this week. It is placed under Asemka Flyover.

"The area has been flattened. Now we are still waiting the engine," he said, Monday (10/16).

Yos Sudarso 1 Pump House Equipped With 3 Rotary Screens

According to him, contractor has targeted to finish the engine installation by this month.

"We're optimistic Kali Besar revitalization project to finish by the end of this year. Citizens are able to enjoy the revitalization area as their new tourism site," he closed.

Linked News
Popular News indeks
  1. MSMEs Bazaar Held at Binus Anggrek Campus

    access_time30-10-2024 remove_red_eye950 personTP Moan Simanjuntak
  2. 250 High School Students in N. Jakarta Learn to Create Digital Content

    access_time01-11-2024 remove_red_eye654 personBudhi Firmansyah Surapati
  3. Satpol PP Expels Illegal Participants at Sudirman - Thamrin CFD

    access_time27-10-2024 remove_red_eye454 personBudhi Firmansyah Surapati
  4. South Jakarta City Government Accelerates Stop BABS

    access_time31-10-2024 remove_red_eye394 personTiyo Surya Sakti
  5. Traffic Arrangement Applied on Jalan Tambak

    access_time28-10-2024 remove_red_eye370 personAldi Geri Lumban Tobing