You don't have javascript enabled. Good luck with that.
Pencarian
 Perbaikan Jalan dan Trotoar di Jaktim Sudah 70 Persen
.
photo Suparni - Beritajakarta.id

Road And Sidewalk Repair in E. Jakarta Has Reached 70 Percent

Toward the end of the year, the road and sidewalk improvement in the East Jakarta area continues to be accelerated. So far, it has been reached 70 percent. 

And neighborhood road, is still under process or has reached 90 percent

 

East Jakarta Bina Marga Sub-dept. Head, Juaini Yusuf said, until now, arterial road repair in his region has been completed.

Broken-Down Susukan PHB's Plaster Repaired

"All arterial roads have been repaired. And neighborhood road, is still under process or has reached 90 percent," he expressed, Monday (11/6).

He explained road repair this year is intensified in nine sub-districts and will be carried out using hotmix layer method.

"Long and wide of the road that will be repaired is varied, depending on its condition," he told.

It is carried out at some sub-districts, as follows:

1. Cakung Sub-district

- Jalan M Noor and Jalan Arun Raya

2. Cipayung Sub-district 

- Jalan Damai PBSI and Jalan Beringin

3. Duren Sawit Sub-district 

- Jalan Kopyor 1-14 and Jalan Bambu Apus

4. Matraman Sub-district

- Jalan Mangga 4 and Jalan Serikaya

5. Pulogadung Sub-district

- Jalan Cakalang III and Jalan Duyung Raya 

6. Jatinegara Sub-district

- Jalan Cipinang Raya and Jalan Jatinegara Timur III

7. Kramat Jati Sub-district

- Jalan Mawar and Jalan Menur

8. Makasar Sub-district

- Jalan Wira Darma 3 and 4, as well as Jalan Infantri

9. Ciracas Sub-district

- Jalan Asem and Jalan Masjid-Taruna

"There are totally thousands of arterial roads repaired," he explained.

This year, his side also plans to repair neighborhood roads and develop eco-friendly sidewalks at 20 spots.

"Neighborhood roads that have been repaired is about 1,300 spots. And the rest are 400 spots and will be repaired soon," he told.

He ensures, until the end of the year, budget absorption in his ranks can reach 80 percent. Moreover, the implementation of current physical activity can be done faster after using the e-catalog system.

"We're optimistic that can do maximal this year," he closed.

Linked News
Popular News indeks
  1. Transjakarta Officially Opens School for Bus Drivers

    access_time20-11-2024 remove_red_eye1043 personAldi Geri Lumban Tobing
  2. Acting Governor Teguh: Coastal Seawall Construction Begins in 2025

    access_time20-11-2024 remove_red_eye907 personFolmer
  3. Legislator Ahmad Lukman Jupiter Wants PT FSTJ Add Shop Cars

    access_time19-11-2024 remove_red_eye551 personDessy Suciati
  4. PMPTSP Agency Launches PIN Greenvest to Prompt Green and Sustainable Investment

    access_time21-11-2024 remove_red_eye448 personAldi Geri Lumban Tobing
  5. Transjakarta Extends its Operation to 11 PM Today

    access_time19-11-2024 remove_red_eye386 personAldi Geri Lumban Tobing