You don't have javascript enabled. Good luck with that.
Pencarian
Sudin SDA Jaktim Perbaiki Turap Longsor di Susukan
.
photo Suparni - Beritajakarta.id

Broken-Down Susukan PHB's Plaster Repaired

East Jakarta Water Resources Sub-dept. repairs broken-down plaster in Susukan Connecting (PHB) Channel on Jalan Raya H. Baping, Susukan, Ciracas. 73 meters of the plaster was broken since September 2017.

We started to repair it in early October and now has reached 70 percent

"We started to repair it in early October and now has reached 70 percent. As target, it will be finished by the end of this month," said Ika Nur Fitriasari, Ciracas Sub-district Water Resources Unit Head, Thursday (10/26).

Inkopal PHB Channel Plaster Repaired

He explained PHB channel was broken due to water erosion. Now, it is repaired using river stone material and built for two meters high with foundation thickness 50 centimeters.

"We deploy 15 PHL personnel to repair plaster," he closed.

Linked News
Popular News indeks
  1. Transjakarta Targets Planting 100,000 Mangroves

    access_time12-07-2025 remove_red_eye393 personBudhi Firmansyah Surapati
  2. Rano Karno Celebrates City's Anniversary with Kamal Residents

    access_time12-07-2025 remove_red_eye389 personFolmer
  3. Residents Enthusiastically Enjoy the Car Free Day in Kebayoran Lama

    access_time13-07-2025 remove_red_eye349 personTiyo Surya Sakti
  4. Traffic Engineering on Jalan Otista to Begin July 20 Due to JPO Revitalization

    access_time17-07-2025 remove_red_eye322 personAldi Geri Lumban Tobing
  5. MRT Jakarta Considers Route Expansion to South Tangerang

    access_time13-07-2025 remove_red_eye315 personAldi Geri Lumban Tobing

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik