You don't have javascript enabled. Good luck with that.
Pencarian
Sudin SDA Jaktim Perbaiki Turap Longsor di Susukan

Broken-Down Susukan PHB's Plaster Repaired

East Jakarta Water Resources Sub-dept. repairs broken-down plaster in Susukan Connecting (PHB) Channel on Jalan Raya H. Baping, Susukan, Ciracas. 73 meters of the plaster was broken since September 2017.

We started to repair it in early October and now has reached 70 percent

"We started to repair it in early October and now has reached 70 percent. As target, it will be finished by the end of this month," said Ika Nur Fitriasari, Ciracas Sub-district Water Resources Unit Head, Thursday (10/26).

Inkopal PHB Channel Plaster Repaired

He explained PHB channel was broken due to water erosion. Now, it is repaired using river stone material and built for two meters high with foundation thickness 50 centimeters.

"We deploy 15 PHL personnel to repair plaster," he closed.

Linked News
Popular News indeks
  1. Jakarta Administration Steps Up Proactive Fire Prevention Efforts

    access_time09-10-2026 remove_red_eye624 personDessy Suciati
  2. MRT Jakarta Integrates Ticket Payments with JakLingko from October 12

    access_time10-10-2026 remove_red_eye580 personAldi Geri Lumban Tobing
  3. New Kelapa Gading-Pulogadung Road to Ease Traffic and Improve Access

    access_time10-10-2026 remove_red_eye547 personAldi Geri Lumban Tobing
  4. Kramat Pulo Fire Survivors Get Help Replacing School Documents

    access_time09-10-2026 remove_red_eye527 personFolmer
  5. Basic Supplies Distributed to Pinang Ranti Fire Survivors

    access_time09-10-2026 remove_red_eye516 personNurito