You don't have javascript enabled. Good luck with that.
Pencarian
Sudin SDA Jaktim Perbaiki Turap Longsor di Susukan

Broken-Down Susukan PHB's Plaster Repaired

East Jakarta Water Resources Sub-dept. repairs broken-down plaster in Susukan Connecting (PHB) Channel on Jalan Raya H. Baping, Susukan, Ciracas. 73 meters of the plaster was broken since September 2017.

We started to repair it in early October and now has reached 70 percent

"We started to repair it in early October and now has reached 70 percent. As target, it will be finished by the end of this month," said Ika Nur Fitriasari, Ciracas Sub-district Water Resources Unit Head, Thursday (10/26).

Inkopal PHB Channel Plaster Repaired

He explained PHB channel was broken due to water erosion. Now, it is repaired using river stone material and built for two meters high with foundation thickness 50 centimeters.

"We deploy 15 PHL personnel to repair plaster," he closed.

Linked News
Popular News indeks
  1. Jakarta Announces Rp 1 Fare for Transjakarta, MRT, and LRT on August 17

    access_time13-08-2026 remove_red_eye882 personAldi Geri Lumban Tobing
  2. Abdul Muis Building Fire Response Nears Completion, No Fatalities Reported

    access_time08-08-2026 remove_red_eye596 personAldi Geri Lumban Tobing
  3. Pramono Urges MUI to Strengthen Synergy in Maintaining Jakarta’s Harmony

    access_time12-08-2026 remove_red_eye573 personDessy Suciati
  4. Jakarta Ensures Public Services Stay Operational After Abdul Muis Building Fire

    access_time08-08-2026 remove_red_eye562 personFakhrizal Fakhri
  5. Fire Site in Utan Kayu Utara Being Cleared

    access_time11-08-2026 remove_red_eye419 personNurito