You don't have javascript enabled. Good luck with that.
Pencarian
Rusun Rorotan dan Nagrak Dialiri Listrik 8 MVA

Electricity in Rorotan and Nagrak Flats Installed

Electricity in Rorotan and Nagrak Marunda Flats, Cilincing, North Jakarta have been installed with 8 mega volt ampere (MVA). Currently 1,000 flat units construction is still running.

Jakarta Provincial Government intensifies flat construction. Electricity is really needed since there are four towers with 1,000 units

"Jakarta Provincial Government intensifies flat construction. Electricity is really needed since there are four towers with 1,000 units. It will be full of activities in here and population will be more dense," said Husein Murad, North Jakarta Mayor, Wednesday (12/13).

Meanwhile, PT. PLN for Jakarta Raya Distribution's General Manager, Muhammad Ikhsan Asaad informed, recently electricity is able in those two flats. His side promises electric power will be stable. Because it will be supplied from several central power houses.

Rorotan RPH Construction Reaches 95 Percent

"From today, electricity in flat will be turned on. It is supplied from several central power houses," he added.

Linked News
Popular News indeks
  1. Transjakarta Commits to Accelerating Modal Integration and Fleet Electrification

    access_time31-08-2026 remove_red_eye601 personAldi Geri Lumban Tobing
  2. JITEX 2026: Fostering a Global Trade and Investment Ecosystem

    access_time01-09-2026 remove_red_eye563 personAldi Geri Lumban Tobing
  3. Pramono Confirms Permanent Bridge to Be Built in Tegal Alur

    access_time29-08-2026 remove_red_eye460 personDessy Suciati
  4. Jakarta Fine Arts and Ceramics Museum Hosts Malangan Exhibition

    access_time29-08-2026 remove_red_eye458 personFakhrizal Fakhri
  5. Pramono Emphasizes Importance of Creative Spaces for Children

    access_time03-09-2026 remove_red_eye434 personDessy Suciati