You don't have javascript enabled. Good luck with that.
Pencarian
Rumah Pompa Luar Batang Diperbaiki

This Week, Luar Batang Pump House Repair is Targeted to Complete

Luar Batang Pump House repair is mentioned will be finished this week. This house pump is located on Jalan Luar Batang 5, RW 01, Penjaringan Urban Village, Penjaringan Sub-district, North Jakarta.

I hope this repair will be finished soon

North Jakarta Mayor, Husein Murad said the pipe has been rusted and perforated. It is feared will reduce its performance in handling inundation and flood.

"I hope this repair will be finished soon. We target it to complete this week because we have entered rainy season now," he expressed while surveying Luar Batang Pump House, Monday (12/18).

Inundation in Jakarta Is Resolved Quickly

Meanwhile, North Jakarta Water Resources Sub-dept. Head, Santo added, two weeks ago his side has started this repair.

"Currently we are waiting for replacement pipe from manufacturer. Besides pipe, stop starter on the panel is also weakened thus need to be replaced," he explained.

He said, that pipe is used to dispose water and has around 10 meters long with 80 centimeters.

"There are two portable pumps at Luar Batang Pump House. Each of them has 500 liters and 100 liters capacities per second. The 100 liters pipe is used to pump mud," he mentioned.

Linked News
Popular News indeks
  1. Transjakarta Resumes Operations with Strategic Service Adjustments

    access_time28-08-2026 remove_red_eye951 personAldi Geri Lumban Tobing
  2. JIF Summit 2026 Drives Global Partnerships and Investment Growth in Jakarta

    access_time28-08-2026 remove_red_eye677 personAldi Geri Lumban Tobing
  3. Transjakarta Commits to Accelerating Modal Integration and Fleet Electrification

    access_time31-08-2026 remove_red_eye567 personAldi Geri Lumban Tobing
  4. JITEX 2026: Fostering a Global Trade and Investment Ecosystem

    access_time01-09-2026 remove_red_eye552 personAldi Geri Lumban Tobing
  5. Drainage Normalization on Jalan Mandioli to Be Completed in October

    access_time28-08-2026 remove_red_eye501 personFolmer