You don't have javascript enabled. Good luck with that.
Pencarian
Jalan Raya Lapangan Tembak Cibubur Akhirnya Diperbaiki

Damaged Roads in East Jakarta Starting to Be Repaired

The complaint of Acting Jakarta Governor Basuki T Purnama on many damaged roads in the capital is responded by East Jakarta Roads Public Works Sub-Department. At this time, several damaged roads in the municipality are starting to be repaired. However, the work is done gradually because rain that still pours until now makes the asphalting process often had to be stopped.

Road Repair Task Force is always mobile for round the clock to monitor damaged roads and repair them

One of the damaged roads repaired is Jalan Lapangan Tembak, Cibubur Urban Village, Ciracas Sub-District, which repaired starting Saturday (7/5). All this time, the road was very jeopardizing the lives of motorists due to potholes which have been existed since a year ago.

Alhamdulillah (thank God), (the road) finally repaired. It has been damaged since over a year,” disclosed Mulyawan, a vendor in PD Pasar Jaya Cibubur who often passes the road, Monday (7/7).

Damaged Road on Jalan Raya Lapangan Tembak Neglected

Meanwhile, Head of Roads and Bridges Maintenance Section for East Jakarta Roads Public Works Sub-Department, Arif Faizal Ritonga, said there are 28 damaged roads spread in 10 sub-districts in East Jakarta.

“Besides Jalan Lapangan Tembak, we’re also repairing Jalan Raya Condet, Jalan Lampiri Kalimalang, and Jalan I Gusti Ngurah Rai. But seeing current weather, the amount of damaged roads is predicted to increase. However, Road Repair Task Force is always mobile for round the clock to monitor damaged roads and repair them,” he stated.

According to Ritonga, there are still 28 damaged roads which have not been repaired yet. Among those roads are Jalan Rawabinong Cipayung, Jalan Pemuda Rawamangun, Jalan DI Panjaitan, Jalan TB Simatupang, Jalan Batu Ampar 3 Kramatjati, Jalan Perintis Kemerdekaan, and Jalan Bantaran Kali Duren Sawit.

“From those 28 damaged roads, 17 are our responsibility to repair them, while the rest 11 are the authority of Public Works Ministry,” he told.

Linked News
Popular News indeks
  1. May Day: Transjakarta Service Adjustments

    access_time01-05-2026 remove_red_eye793 personAldi Geri Lumban Tobing
  2. The Lights-Out Action Successfully Reduces Carbon Emissions

    access_time27-04-2026 remove_red_eye561 personAldi Geri Lumban Tobing
  3. MRT Jakarta Urged to Enhance Power Outage Mitigation System

    access_time27-04-2026 remove_red_eye546 personFakhrizal Fakhri
  4. City Deploys Massive Cleanup Force for May Day at Monas

    access_time01-05-2026 remove_red_eye533 personAldi Geri Lumban Tobing
  5. Dinkes Sets Up Health Posts for May Day Events

    access_time01-05-2026 remove_red_eye532 personDessy Suciati