You don't have javascript enabled. Good luck with that.
Pencarian
90 KK Kelurahan Kemayoran Manfaatkan Ipal Komunal

90 Kemayoran Urban Village Families Utilize Communal IPAL

Communal Wastewater Treatment Plant (IPAL) construction at RW 07, Kemayoran Urban Village, Central Jakarta has completed. This IPAL now can be used for 90 families from RT 08 and 09.

Most houses don't have sanitation system and wastewater is flowed directly to sewer

Kemayoran Urban Village Head, Bangun Manalu conveyed, IPAL construction has completed in last December. Hopefully residents can use IPAL well because many houses are not installed with certain channel to process wastewater.

IPAL will Be Built in Harapan Mulia

"Most houses don't have sanitation system and wastewater is flowed directly to sewer,"  he said, Wednesday (2/21).

He explained, in sanitation system mechanism, there are 11 ponds used for filter processing to produce clear water

First processing ponds, called inlet, has diameter 1x1.5 meters. Wastewater from first pond will be flowed to main pond with diameter 4x3 meters.

"After passing the first step, wastewater will enter hanging tank which divided water into 8 channels with diameter 1x3.2 meters. That pond is equipped with anaerobes bacteria to unravel waste," he stated.

After that, water will enter final deposition pond, then entered outlet where the filtered water will be pumped to be discharged into channel.

Meanwhile, Yeti (50) resident of RT 08 admitted happy with communal IPAL existence. Filtered wastewater will be not contaminated her environment.

"Former IPAL hole is installed with therapy stones. Not only IPAL that is beneficial, but former IPAL hole also can be used by residents for feet therapy every morning and afternoon," he added.

Linked News
Popular News indeks
  1. Jakarta Taps MSMEs and Creative Economy to Secure Global Top 50 Spot

    access_time11-07-2026 remove_red_eye1707 personAldi Geri Lumban Tobing
  2. Ciliwung River Normalization Accelerated, Pramono Ensures Land Acquisition Without Intermediaries

    access_time10-07-2026 remove_red_eye1478 personDessy Suciati
  3. Blocked Drain on Jalan Palmerah Utara is Being Repaired

    access_time10-07-2026 remove_red_eye1334 personFolmer
  4. Pramono will Take Firm Action Against Individuals Involved in Extortion

    access_time13-07-2026 remove_red_eye1119 personDessy Suciati
  5. The Pegangsaan Dua-Manggarai LRT Project Reaches 95 Percent Completion

    access_time14-07-2026 remove_red_eye814 personDessy Suciati