You don't have javascript enabled. Good luck with that.
Pencarian
       Pengerukan Kali Cakung Lama Ditarget Rampung Tiga Bulan
.
photo Nurito - Beritajakarta.id

Cakung Lama River Dredging Targeted to Complete in Three Months

Cakung Lama River dredging at RW 05, Rawa Ternate Urban Village, Cakung, East Jakarta is targeted to completed in three months.

We are dredging Cakung Lama River and targeting it to complete in next three months

East Jakarta Water Resources Sub-Dept. Head, Mustajab mentioned, Cakung Lama River dredging has been started since a week ago. His side also deploys two excavators which are long arm excavator and amphibious excavator.

Cakung Lama River in Rawa Ternate Dredged

"We are dredging Cakung Lama River and targeting it to complete in next three months. Hopefully it can overcome flood that usually happens in Rawa Ternate," he explained, Monday (3/5).

Around six kilometers river is dredged. Its condition is full of mud and trash while its depth is only one meter. Later his side will dredge it to about 2.5 meters depth.

"We will dredge it to 2.5 meters depth. By using two heavy equipment, we hope dredging process can be accelerated," he said.

Linked News
Popular News indeks
  1. Residents Enthusiastically Enjoy the Car Free Day in Kebayoran Lama

    access_time13-07-2025 remove_red_eye357 personTiyo Surya Sakti
  2. Traffic Engineering on Jalan Otista to Begin July 20 Due to JPO Revitalization

    access_time17-07-2025 remove_red_eye328 personAldi Geri Lumban Tobing
  3. MRT Jakarta Considers Route Expansion to South Tangerang

    access_time13-07-2025 remove_red_eye318 personAldi Geri Lumban Tobing
  4. Smoke-Free Neighborhoods Could Be a Pilot Project for the KTR Regional Regulation Implementation

    access_time18-07-2025 remove_red_eye239 personFakhrizal Fakhri
  5. Council Encourages the Increase of RPTRAs for Child Growth and Development

    access_time18-07-2025 remove_red_eye238 personFakhrizal Fakhri

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik