You don't have javascript enabled. Good luck with that.
Pencarian
       Pengerukan Kali Cakung Lama Ditarget Rampung Tiga Bulan
.
photo Nurito - Beritajakarta.id

Cakung Lama River Dredging Targeted to Complete in Three Months

Cakung Lama River dredging at RW 05, Rawa Ternate Urban Village, Cakung, East Jakarta is targeted to completed in three months.

We are dredging Cakung Lama River and targeting it to complete in next three months

East Jakarta Water Resources Sub-Dept. Head, Mustajab mentioned, Cakung Lama River dredging has been started since a week ago. His side also deploys two excavators which are long arm excavator and amphibious excavator.

Cakung Lama River in Rawa Ternate Dredged

"We are dredging Cakung Lama River and targeting it to complete in next three months. Hopefully it can overcome flood that usually happens in Rawa Ternate," he explained, Monday (3/5).

Around six kilometers river is dredged. Its condition is full of mud and trash while its depth is only one meter. Later his side will dredge it to about 2.5 meters depth.

"We will dredge it to 2.5 meters depth. By using two heavy equipment, we hope dredging process can be accelerated," he said.

Linked News
Popular News indeks
  1. Transjakarta Officially Opens School for Bus Drivers

    access_time20-11-2024 remove_red_eye1036 personAldi Geri Lumban Tobing
  2. Acting Governor Teguh: Coastal Seawall Construction Begins in 2025

    access_time20-11-2024 remove_red_eye902 personFolmer
  3. Legislator Ahmad Lukman Jupiter Wants PT FSTJ Add Shop Cars

    access_time19-11-2024 remove_red_eye541 personDessy Suciati
  4. PMPTSP Agency Launches PIN Greenvest to Prompt Green and Sustainable Investment

    access_time21-11-2024 remove_red_eye446 personAldi Geri Lumban Tobing
  5. Transjakarta Extends its Operation to 11 PM Today

    access_time19-11-2024 remove_red_eye379 personAldi Geri Lumban Tobing