You don't have javascript enabled. Good luck with that.
Pencarian
Perbaikan Turap Jl Jingga Ditarget Rampung 2 Bulan

Two Months, Sheet Pile Repair at Jalan Jingga Completed

The connecting channel's sheet pile (locally known as turap) as long as 161 meters on Jalan Jingga Raya, Kelapa Gading Timur Urban Village, Kelapa Gading, North Jakarta, whose position is tilted and damaged, is still under repair.

It's already prone to fall. That's why we have done repair since two weeks ago

"The sheet pile itself has 2.8 meters length. Repair is targeted to be completed within two months," expressed Rukmana, Executing Unit Head for Kelapa Gading Sub-district Water Resources, Monday (3/26).

Sheet Pile will Be Installed on Kebon Manggis Collapsed Road

Rukmana expressed repair is executed by replacing parts of plaster experiencing tilt. The work uses stone material with vertical and horizontal slub.

"It's already prone to fall. That's why we have done repair since two weeks ago," he stated.

Linked News
Popular News indeks
  1. Pramono Inaugurates GMAHK Taman Harapan Jakarta

    access_time25-10-2026 remove_red_eye525 personDessy Suciati
  2. JRF, Ye Concert Inject Rp 625 Billion into Jakarta's Economy

    access_time26-10-2026 remove_red_eye502 personDessy Suciati
  3. Transjakarta Adjusts Routes Amid Demonstrations

    access_time28-10-2026 remove_red_eye467 personAldi Geri Lumban Tobing
  4. Munjirin Encourages Government and Residents to Implement Waste Sorting

    access_time30-10-2026 remove_red_eye395 personNurito
  5. Participating in a 10K Run, Pramono Calls JRF a Role Model for Running Events in Indonesia

    access_time25-10-2026 remove_red_eye395 personAldi Geri Lumban Tobing