You don't have javascript enabled. Good luck with that.
Pencarian
Dua Rangkaian Kereta MRT Tiba di Jakarta

Two MRT Trains Arrive in Jakarta

Two Mass Rapid Transit (MRT) trains have arrived in Jakarta by shipment via Tanjung Priok Port, Wednesday (4/4) morning.

These two MRT trains arrived at 5 PM in Tanjung Priok Port today

PT. MRT Jakarta Director, William P. Sahbandar said, those MRT trains have arrived since 5 AM. "These two MRT trains arrived at 5 PM in Tanjung Priok Port today," he informed.

He explained, train will be unloaded from cargo ship in Thursday (4/5) and it will be transported to Lebak Bulus Depot using multi-axle trailer.

MRT Construction Reaches 92.50 Percent

His side also conducted shipment simulation and test from February 2018 to ensure shipping can be done well.

"We do it to minimize traffic jam that could be happened," he explained.

He added, 14 other sets of train will be shipped by the end of June and it is targeted to arrive in Jakarta by the end of October. All of trains will be prepared for trial run.

For the first phase, PT. MRT Jakarta has prepared 16 train sets. 14 trains will be operated while two others will be backed up.

"Later on, MRT will operate from 5 AM to midnight. At rush hour, train operated by a distance of 5 minutes between trains," he informed.

Linked News
Popular News indeks
  1. Pramono Pushes to Complete Long-Delayed Pluit JLNT by March 2027

    access_time20-11-2026 remove_red_eye683 personDessy Suciati
  2. JAF 2026 Highlights Maritime Heritage and Coastal Architecture

    access_time21-11-2026 remove_red_eye667 personAnita Karyati
  3. Jakarta Strengthens ASEAN Cooperation on Climate, Transport, and Youth

    access_time20-11-2026 remove_red_eye630 personFolmer
  4. BORJU Markets 200 Local Products

    access_time20-11-2026 remove_red_eye598 personAnita Karyati
  5. Jakarta Hosts 2026 UCWDC Asian Championship with 280 Dancers from Five Countries

    access_time20-11-2026 remove_red_eye581 personBudhi Firmansyah Surapati