You don't have javascript enabled. Good luck with that.
Pencarian
Dua Rangkaian Kereta MRT Tiba di Jakarta

Two MRT Trains Arrive in Jakarta

Two Mass Rapid Transit (MRT) trains have arrived in Jakarta by shipment via Tanjung Priok Port, Wednesday (4/4) morning.

These two MRT trains arrived at 5 PM in Tanjung Priok Port today

PT. MRT Jakarta Director, William P. Sahbandar said, those MRT trains have arrived since 5 AM. "These two MRT trains arrived at 5 PM in Tanjung Priok Port today," he informed.

He explained, train will be unloaded from cargo ship in Thursday (4/5) and it will be transported to Lebak Bulus Depot using multi-axle trailer.

MRT Construction Reaches 92.50 Percent

His side also conducted shipment simulation and test from February 2018 to ensure shipping can be done well.

"We do it to minimize traffic jam that could be happened," he explained.

He added, 14 other sets of train will be shipped by the end of June and it is targeted to arrive in Jakarta by the end of October. All of trains will be prepared for trial run.

For the first phase, PT. MRT Jakarta has prepared 16 train sets. 14 trains will be operated while two others will be backed up.

"Later on, MRT will operate from 5 AM to midnight. At rush hour, train operated by a distance of 5 minutes between trains," he informed.

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye870 personTiyo Surya Sakti
  2. South Jakarta Tackles 38 Dengue Cases to Prevent Outbreak

    access_time02-02-2026 remove_red_eye767 personTiyo Surya Sakti
  3. Pramono: Jakarta Government Acts Swiftly to Tackle Flooding

    access_time30-01-2026 remove_red_eye371 personDessy Suciati
  4. Several Microtrans Routes Diverted

    access_time31-01-2026 remove_red_eye369 personAldi Geri Lumban Tobing
  5. Jakarta Showers to Make Way for Partly Cloudy Skies

    access_time30-01-2026 remove_red_eye362 personDessy Suciati
close