You don't have javascript enabled. Good luck with that.
Pencarian
 Dua Rangkaian MRT Diberangkatkan dari Jepang Hari ini
.
photo Istimewa - Beritajakarta.id

Two MRT Trains Shipped From Japan

Two Mass Rapid Transit (MRT) trains have been sent from Japan to Jakarta by sea, Wednesday (3/7). Each train contains of six train cars.

Now it is already in Tokyo Port and ready to depart today towards Tanjung Priok, North Jakarta

PT. MRT Jakarta Corporate Secretary, Tugabus Hikmatullah said, it is shipped using Ellensborg ship that has a danish flag. Previously this ship has departed from Toyohashi Port to Tokyo Port.

"Now it is already in Tokyo Port and ready to depart today towards Tanjung Priok, North Jakarta. If the weather is good, it will arrive in Jakarta on March 23, 2018," he said, Wednesday (3/7).

MRT Construction Reaches 91,86 Percent

He explained, this shipping is a part of total 16 trains ordered. Those trains have been tested, from its speed that reaches 14-20 kilometers per hour, to its resistance to low temperature in Japan that could reach 5-9 Celsius degree.

"At first, three trains are planned to be shipped, but one train haven't run the test so it is not ready to be shopped. Other trains are still being produced," he added.

Linked News
Popular News indeks
  1. Rano Inspects Location and Delivers Aid to Fire Victims in Bukit Duri

    access_time20-07-2025 remove_red_eye670 personNurito
  2. Assistance Continues to Be Provided to Bukit Duri Fire Victims

    access_time20-07-2025 remove_red_eye456 personNurito
  3. Rano Ensures Swift Action in Bukit Duri Fire Handling

    access_time19-07-2025 remove_red_eye397 personFakhrizal Fakhri
  4. C. Jakarta TP PKK Grows 2,470 Chili and Tomato Seedlings

    access_time18-07-2025 remove_red_eye389 personFolmer
  5. Munjirin Leads Simultaneous Planting at RPTRA Rawa Jaya

    access_time18-07-2025 remove_red_eye386 personNurito

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik