You don't have javascript enabled. Good luck with that.
Pencarian
Perbaikan Turap Phb Gading Kirana Ditarget Rampung Pertengahan Mei

Gading Kirana PHB Channel's Retaining Wall Repair will Be Completed Soon

North Jakarta Water Resources (SDA) Sub-dept. targets to repair Gading Kirana connecting (PHB) channel's retaining wall at RW 08, Kelapa Gading Barat Urban Village, Kelapa Gading completely by mid of this May.

We hope it can be completed in these one or two weeks or by mid of this May

Kelapa Gading Sub-district SDA Unit Head, Rukmana said retaining wall repair is done along 135 meters because it is damaged and its position is tilted.

Jl. I Gusti Ngurah Rai's PHB Channel will Be Arranged

"Retaining wall height is around three meters. We repair it using river stone and iron materials," he said, Friday (5/4).

He explained, this repair has been started since one month ago. Currently its progress has reached around 90 percent.

"Hopefully it can be completed in one or two weeks or by mid of this May," he stated.

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye869 personTiyo Surya Sakti
  2. TransJabodetabek Expansion, a Strategic Step to Increase Public Transportation Use

    access_time26-01-2026 remove_red_eye428 personFakhrizal Fakhri
  3. South Jakarta Tackles 38 Dengue Cases to Prevent Outbreak

    access_time02-02-2026 remove_red_eye384 personTiyo Surya Sakti
  4. Jakarta Prepares OMC and 200 Excavators to Prevent Flood

    access_time26-01-2026 remove_red_eye371 personDessy Suciati
  5. Jakarta Showers to Make Way for Partly Cloudy Skies

    access_time30-01-2026 remove_red_eye359 personDessy Suciati
close