You don't have javascript enabled. Good luck with that.
Pencarian
Trotoar di 35 Titik Pemberhentian OK Otrip Ditata

35 OK OTrip Sidewalk's Stop Points in North Jakarta Arranged

North Jakarta Bina Marga Sub-dept. began to arrange sidewalks in 35 OK OTrip stop points in Cilincing Sub-district. Previously those stop points were not equipped with sidewalk and others have been damaged.

This sidewalk arrangement is needed to give comfort for OK OTrip users

North Jakarta Bina Marga Sub-dept.'s Road and Bridge Section Head, Ujang Royani said, those stop points that will be arranged are on Jl. Kebantenan, Dewa Kembar, Bakti Cilincing, Sungai Landak, Gudang Peluru, Rorotan, and Jl. Karang Kendal.

Bus Stop Point of OK OTrip Pondok Labu-Lebak Bulus Proposed to Be Added

"This sidewalk arrangement is needed to give comfort for OK OTrip users," he explained, Monday (5/7).

He mentioned, his side builds 5x2 meters sidewalks in each location. This work has been started since last month.

"Currently there are around three to five points that will be completed soon," he stated.

Linked News
Popular News indeks
  1. Rano Reaffirms Jakarta's Vision of Becoming a City of Cinema

    access_time22-10-2026 remove_red_eye5568 personBudhi Firmansyah Surapati
  2. Check Saturday's Traffic Diversions for Jakarta Running Festival

    access_time23-10-2026 remove_red_eye919 personAldi Geri Lumban Tobing
  3. MRT Jakarta Prolongs Weekend Service for Kanye West Concert

    access_time23-10-2026 remove_red_eye822 personAldi Geri Lumban Tobing
  4. MRT Jakarta Modifies Schedule for Jakarta Running Festival

    access_time23-10-2026 remove_red_eye799 personAldi Geri Lumban Tobing
  5. Jakarta–Turkey Film Production to Begin Filming in 2027

    access_time22-10-2026 remove_red_eye743 personBudhi Firmansyah Surapati