You don't have javascript enabled. Good luck with that.
Pencarian
3000 Ton Geotekstil Untuk Equestrian Park Tiba di Jakarta

3,000 Tons of Geotextile For Equestrian Park Arrived in Jakarta

3,000 tons of geotextile as the sand mixture for International Equestrian Park arena have been arrived at Tanjung Priok Port, Monday (5/7). Geotextile is used to maintain moist and concentration on soil when horse jumping on the arena. 

Four containers or 3,000 tons have arrived in this first phase

PT. Pulo Mas Jaya Director, Bambang Mursalin said, geotextile shipping is done gradually through sea lane. 3,000 tons will be shipped on the first and second phase.

Jakarta Equestrian International Park Gets Certification From OIE

"Four containers or 3,000 tons have arrived in this first phase. Its remaining will be arrived on May 20-21," he informed, Tuesday (5/8).

He explained, each container could accommodate 750 tons. These geotextiles sent from Germany is temporarily placed on the north side of PT. Pulo Mas Jaya office, Jl. Jenderal Ahmad Yani, Kayu Putih, East Jakarta.

Geotextile is used by mixing it with sand. Three-four kilograms of geotextile are usually mixed with every square meters of sand.

"With this component, sand can be elastic when the horse step on the sand," he added.

Linked News
Popular News indeks
  1. May Day: Transjakarta Service Adjustments

    access_time01-05-2026 remove_red_eye773 personAldi Geri Lumban Tobing
  2. The Lights-Out Action Successfully Reduces Carbon Emissions

    access_time27-04-2026 remove_red_eye557 personAldi Geri Lumban Tobing
  3. MRT Jakarta Urged to Enhance Power Outage Mitigation System

    access_time27-04-2026 remove_red_eye545 personFakhrizal Fakhri
  4. City Deploys Massive Cleanup Force for May Day at Monas

    access_time01-05-2026 remove_red_eye513 personAldi Geri Lumban Tobing
  5. Dinkes Sets Up Health Posts for May Day Events

    access_time01-05-2026 remove_red_eye510 personDessy Suciati