You don't have javascript enabled. Good luck with that.
Pencarian
Perbaikan Turap Penghubung Jalan Sindang Terusan Ditarget Rampung Pekan ini

This Week, Repair of Sindang Terusan Connecting Channel's Sheet Pile Completed

The repair of connecting channel's sheet pile on Jalan Sindang Terusan, Rawa Badak Utara Urban Village, Koja is targeted to be finished this week.

We repair up to 86 meters length with 2 meters height

Erlan, Executing Unit Head of Koja Sub-district Water Resources Sub-dept. expressed sheet pile repair has been ongoing since May 16, 2018.

Collapsed Sheet Pile on Jalan Petamburan 6 Repaired

"We repair up to 86 meters length with 2 meters height," he stated, Monday (6/25).

Its repair uses river rocks with slup. While the width of the sheet pile is repaired up to 30 centimeters.

"We continue it again yesterday, hopefully it can be complete this week," he uttered.

Linked News
Popular News indeks
  1. May Day: Transjakarta Service Adjustments

    access_time01-05-2026 remove_red_eye775 personAldi Geri Lumban Tobing
  2. The Lights-Out Action Successfully Reduces Carbon Emissions

    access_time27-04-2026 remove_red_eye557 personAldi Geri Lumban Tobing
  3. MRT Jakarta Urged to Enhance Power Outage Mitigation System

    access_time27-04-2026 remove_red_eye545 personFakhrizal Fakhri
  4. City Deploys Massive Cleanup Force for May Day at Monas

    access_time01-05-2026 remove_red_eye515 personAldi Geri Lumban Tobing
  5. Dinkes Sets Up Health Posts for May Day Events

    access_time01-05-2026 remove_red_eye513 personDessy Suciati