You don't have javascript enabled. Good luck with that.
Pencarian
Perbaikan Turap Penghubung Jalan Sindang Terusan Ditarget Rampung Pekan ini

This Week, Repair of Sindang Terusan Connecting Channel's Sheet Pile Completed

The repair of connecting channel's sheet pile on Jalan Sindang Terusan, Rawa Badak Utara Urban Village, Koja is targeted to be finished this week.

We repair up to 86 meters length with 2 meters height

Erlan, Executing Unit Head of Koja Sub-district Water Resources Sub-dept. expressed sheet pile repair has been ongoing since May 16, 2018.

Collapsed Sheet Pile on Jalan Petamburan 6 Repaired

"We repair up to 86 meters length with 2 meters height," he stated, Monday (6/25).

Its repair uses river rocks with slup. While the width of the sheet pile is repaired up to 30 centimeters.

"We continue it again yesterday, hopefully it can be complete this week," he uttered.

Linked News
Popular News indeks
  1. Fire at Pondok Bambu Allegedly Triggered by Electrical Short

    access_time19-05-2026 remove_red_eye1384 personNurito
  2. Governor Pramono Named Vice Chair of C40 Cities Steering Committee

    access_time18-05-2026 remove_red_eye1016 personAldi Geri Lumban Tobing
  3. Inundation on DI Panjaitan Road Recede

    access_time20-05-2026 remove_red_eye845 personNurito
  4. Dharma Jaya Ready for Thousands of Eid al-Adha Sacrifices

    access_time20-05-2026 remove_red_eye652 personAldi Geri Lumban Tobing
  5. Rasuna Said Car-Free Day to Return in June 2026

    access_time16-05-2026 remove_red_eye634 personAldi Geri Lumban Tobing