You don't have javascript enabled. Good luck with that.
Pencarian
Perbaikan Turap Penghubung Jalan Sindang Terusan Ditarget Rampung Pekan ini

This Week, Repair of Sindang Terusan Connecting Channel's Sheet Pile Completed

The repair of connecting channel's sheet pile on Jalan Sindang Terusan, Rawa Badak Utara Urban Village, Koja is targeted to be finished this week.

We repair up to 86 meters length with 2 meters height

Erlan, Executing Unit Head of Koja Sub-district Water Resources Sub-dept. expressed sheet pile repair has been ongoing since May 16, 2018.

Collapsed Sheet Pile on Jalan Petamburan 6 Repaired

"We repair up to 86 meters length with 2 meters height," he stated, Monday (6/25).

Its repair uses river rocks with slup. While the width of the sheet pile is repaired up to 30 centimeters.

"We continue it again yesterday, hopefully it can be complete this week," he uttered.

Linked News
Popular News indeks
  1. Volcanic Ash Reaches Jakarta, Health Agency Calls for Protective Measures

    access_time06-09-2026 remove_red_eye1032 personBudhi Firmansyah Surapati
  2. Transjakarta Commits to Accelerating Modal Integration and Fleet Electrification

    access_time31-08-2026 remove_red_eye691 personAldi Geri Lumban Tobing
  3. Jakartans Urged to Stay Calm and Take Precautions Amid Mt. Anak Krakatau Volcanic Ash

    access_time06-09-2026 remove_red_eye605 personBudhi Firmansyah Surapati
  4. JITEX 2026: Fostering a Global Trade and Investment Ecosystem

    access_time01-09-2026 remove_red_eye592 personAldi Geri Lumban Tobing
  5. Jakarta BPBD Urges Residents to Prepare for Meteorological Drought

    access_time04-09-2026 remove_red_eye509 personAldi Geri Lumban Tobing