You don't have javascript enabled. Good luck with that.
Pencarian
 Pembangunan Jembatan Gantung Srengseng Sawah Capai 90 Persen

Srengseng Sawah Suspension Bridge Construction Reaches 90 Percent

Srengseng Sawah Suspension Bridge construction in Jagakarsa, South Jakarta currently reaches 90 percent. This bridge is targeted to be used by residents on August 15, 2018.

Now its construction reaches 90 percent. We plan to inaugurate it on August 15

Srengseng Sawah Urban Village Head, Tubagus Masruri mentioned, main building is already finished. It is only to do its finishing.

"Now its construction reaches 90 percent. We plan to inaugurate it on August 15," he informed, Tuesday (7/31).

Suspension Bridge Construction in Srengseng Sawah Started

Recently, the workers are installing its floor and railing. Meranti wood will be used for bridge's floor to beautify its appearance.

"This crossing bridge can only be used by pedestrian. We will forbid two-wheeled vehicles to use it," he affirmed.

After this bridge construction is finished and inaugurated, he plans to demolish the former suspension bridge. But his side needs to coordinate its demolition by coordinating with local residents first.

"We need to talk to local residents first because they built the former bridge independently," he conveyed.

Linked News
Popular News indeks
  1. Pram-Rano Attend Bung Karno Festival at Proklamasi Park

    access_time20-06-2026 remove_red_eye1086 personFolmer
  2. JIS-Ancol Integrated Infrastructure Officially Activated

    access_time23-06-2026 remove_red_eye568 personDessy Suciati
  3. Free Cake-Making Training Held at RPTRA Mustika Ratu

    access_time23-06-2026 remove_red_eye485 personNurito
  4. Metropolitan City Rally 2026 to Be Held at City Hall

    access_time19-06-2026 remove_red_eye469 personAldi Geri Lumban Tobing
  5. Rano Officially Opens Discover Betawi Art and Culture 2026

    access_time19-06-2026 remove_red_eye468 personBudhi Firmansyah Surapati