You don't have javascript enabled. Good luck with that.
Pencarian
Hari Ini, Kereta LRT Diuji Coba Fungsional

Two LRT Trains Functionally Trialled

Through PT Light Rail Transit (LRT) Jakarta, the city-owned construction company PT Jakarta Propertindo (Jakpro) is conducting the first functional trial towards two trains, Wednesday (8/15).

Today two trains are trialled with a distance of 5.8 kilometers, from Velodrome Station

PT LRT Jakarta CEO, Allan Tandiono disclosed that it is conducted with a limited number of passengers, which are 100 people by traveling the Velodrome Station, Rawamangun, East Jakarta to the Boulevard Utara Station in Kelapa Gading Mall, North Jakarta.

"Today two trains are trialed with a distance of 5.8 kilometers, from Velodrome Station, Rawamangun to Boulevard Utara Station, Kelapa Gading Mall," he stated, Wednesday (8/15).

LRT will Be Trialled on August 15

In its trial, the train is controlled by the machinists with a maximum speed of 40 kilometers per hour on a straight track and 25 kilometers per hour on a cornering track.

Linked News
Popular News indeks
  1. Jakarta Government Guarantees Full Medical Care for Bantargebang Landslide Victims

    access_time09-03-2026 remove_red_eye1296 personDessy Suciati
  2. Commission E Supports Restricting Children's Access to Social Media

    access_time09-03-2026 remove_red_eye1128 personFakhrizal Fakhri
  3. Affordable and High-Quality Staple Goods Offered at Ramadan Bazaar

    access_time09-03-2026 remove_red_eye839 personAldi Geri Lumban Tobing
  4. Jakarta Planetarium Rolls Out Varied Shows for Eid al-Fitr Holiday

    access_time11-03-2026 remove_red_eye290 personAldi Geri Lumban Tobing
  5. Jakarta Speeds Up Flood Mitigation Efforts

    access_time08-03-2026 remove_red_eye288 personAldi Geri Lumban Tobing