You don't have javascript enabled. Good luck with that.
Pencarian
Hari Ini, Kereta LRT Diuji Coba Fungsional

Two LRT Trains Functionally Trialled

Through PT Light Rail Transit (LRT) Jakarta, the city-owned construction company PT Jakarta Propertindo (Jakpro) is conducting the first functional trial towards two trains, Wednesday (8/15).

Today two trains are trialled with a distance of 5.8 kilometers, from Velodrome Station

PT LRT Jakarta CEO, Allan Tandiono disclosed that it is conducted with a limited number of passengers, which are 100 people by traveling the Velodrome Station, Rawamangun, East Jakarta to the Boulevard Utara Station in Kelapa Gading Mall, North Jakarta.

"Today two trains are trialed with a distance of 5.8 kilometers, from Velodrome Station, Rawamangun to Boulevard Utara Station, Kelapa Gading Mall," he stated, Wednesday (8/15).

LRT will Be Trialled on August 15

In its trial, the train is controlled by the machinists with a maximum speed of 40 kilometers per hour on a straight track and 25 kilometers per hour on a cornering track.

Linked News
Popular News indeks
  1. Rano Reaffirms Jakarta's Vision of Becoming a City of Cinema

    access_time22-10-2026 remove_red_eye5437 personBudhi Firmansyah Surapati
  2. Jakarta Provincial Government Receives a Grant of Rp 9.6 Billion in KPK`s Seized Assets

    access_time20-10-2026 remove_red_eye4590 personDessy Suciati
  3. Drainage Channels Along Two Rawajati Roads Dredged

    access_time21-10-2026 remove_red_eye1786 personTiyo Surya Sakti
  4. Jakarta Pushed for Education Equity to Retain Top Student City Rank

    access_time19-10-2026 remove_red_eye1002 personFakhrizal Fakhri
  5. Jakarta Esports 2026: Celebrating Local Games, Music and More

    access_time19-10-2026 remove_red_eye968 personAldi Geri Lumban Tobing