You don't have javascript enabled. Good luck with that.
Pencarian
Saluran Air Jl Melodi Mas 3 Pegangsaan Dua Dinormalisasi

Channel on Jalan Melodi Mas 3 Normalized

A water channel on Jalan Melodi Mas 3, RW 20, Pegangsaan Dua Urban Village, Kelapa Gading is normalized.

This work has been done since August 3 and is targeted to be finished in mid-September

Kelapa Gading Water Resources Executing Unit Head, Rukmana explained that the channel is covered by soil up to 225 meters. As a result, the water channel is malfunctioning and often causes puddles in the surrounding area.

"The channel width was originally 60 centimeters with 60 centimeters depth, so we do normalization," he expressed, Monday (8/20).

Channels in Petojo Selatan Normalized

He assessed that normalization itself will include sheet pile development using river rock materials. It is conducted, as the sheet pile condition has been severely damaged due to buried material.

"This work has been done since August 3 and is targeted to be finished in mid-September," he stated.

Linked News
Popular News indeks
  1. Transjakarta Brings Lunar New Year Festivities to Public Transport

    access_time16-02-2026 remove_red_eye975 personAldi Geri Lumban Tobing
  2. Free Transit Card Applications Skyrocket 143%, Passing 76k Mark

    access_time20-02-2026 remove_red_eye935 personAldi Geri Lumban Tobing
  3. Jakarta Govt-City Council Step Up Coordination to Address Key Urban Challenges

    access_time22-02-2026 remove_red_eye844 personFakhrizal Fakhri
  4. Public Works Agency Gets Transjakarta Corridor 13 Back in Tip-Top Shape

    access_time17-02-2026 remove_red_eye712 personAldi Geri Lumban Tobing
  5. Chinese New Year Holiday, Ancol Flocked by Visitors

    access_time16-02-2026 remove_red_eye609 personAnita Karyati