You don't have javascript enabled. Good luck with that.
Pencarian
Saluran Air Jl Melodi Mas 3 Pegangsaan Dua Dinormalisasi

Channel on Jalan Melodi Mas 3 Normalized

A water channel on Jalan Melodi Mas 3, RW 20, Pegangsaan Dua Urban Village, Kelapa Gading is normalized.

This work has been done since August 3 and is targeted to be finished in mid-September

Kelapa Gading Water Resources Executing Unit Head, Rukmana explained that the channel is covered by soil up to 225 meters. As a result, the water channel is malfunctioning and often causes puddles in the surrounding area.

"The channel width was originally 60 centimeters with 60 centimeters depth, so we do normalization," he expressed, Monday (8/20).

Channels in Petojo Selatan Normalized

He assessed that normalization itself will include sheet pile development using river rock materials. It is conducted, as the sheet pile condition has been severely damaged due to buried material.

"This work has been done since August 3 and is targeted to be finished in mid-September," he stated.

Linked News
Popular News indeks
  1. Open for All: Jakarta City Hall Welcomes Visitors for Namu Balai Kota

    access_time03-10-2026 remove_red_eye762 personDessy Suciati
  2. Transjakarta Reaffirms Ban on Busking in Mikrotrans and Bus Stops

    access_time02-10-2026 remove_red_eye551 personAldi Geri Lumban Tobing
  3. 1,500 Runners and Pets Hit the Track for World Rabies Day Run 2026

    access_time03-10-2026 remove_red_eye549 personAnita Karyati
  4. Commission D Supports Reserve Fund for Long-Term Infrastructure

    access_time02-10-2026 remove_red_eye527 personFakhrizal Fakhri
  5. Jakarta Logs 0.13% Inflation as Chicken, Chili, and Rice Push Prices Up

    access_time03-10-2026 remove_red_eye510 personFakhrizal Fakhri