You don't have javascript enabled. Good luck with that.
Pencarian
Saluran Air Jl Melodi Mas 3 Pegangsaan Dua Dinormalisasi

Channel on Jalan Melodi Mas 3 Normalized

A water channel on Jalan Melodi Mas 3, RW 20, Pegangsaan Dua Urban Village, Kelapa Gading is normalized.

This work has been done since August 3 and is targeted to be finished in mid-September

Kelapa Gading Water Resources Executing Unit Head, Rukmana explained that the channel is covered by soil up to 225 meters. As a result, the water channel is malfunctioning and often causes puddles in the surrounding area.

"The channel width was originally 60 centimeters with 60 centimeters depth, so we do normalization," he expressed, Monday (8/20).

Channels in Petojo Selatan Normalized

He assessed that normalization itself will include sheet pile development using river rock materials. It is conducted, as the sheet pile condition has been severely damaged due to buried material.

"This work has been done since August 3 and is targeted to be finished in mid-September," he stated.

Linked News
Popular News indeks
  1. Jakarta Council Begins Deliberations on New Population and Housing Bylaws

    access_time21-08-2026 remove_red_eye1933 personFakhrizal Fakhri
  2. Pramono Vows to Prioritize Jakarta’s Strategic Development

    access_time22-08-2026 remove_red_eye1025 personDessy Suciati
  3. Rano: CIEIE 2026 to Catapult Jakarta’s MSMEs onto the International Stage

    access_time25-08-2026 remove_red_eye720 personBudhi Firmansyah Surapati
  4. Pramono Pushes for Partnership Between New Toto Tentrem and Tarakan Hospitals

    access_time24-08-2026 remove_red_eye639 personDessy Suciati
  5. New LRT Jakarta Route Set for Official Launch on August 26

    access_time22-08-2026 remove_red_eye499 personDessy Suciati