You don't have javascript enabled. Good luck with that.
Pencarian
Saluran Air Jl Melodi Mas 3 Pegangsaan Dua Dinormalisasi

Channel on Jalan Melodi Mas 3 Normalized

A water channel on Jalan Melodi Mas 3, RW 20, Pegangsaan Dua Urban Village, Kelapa Gading is normalized.

This work has been done since August 3 and is targeted to be finished in mid-September

Kelapa Gading Water Resources Executing Unit Head, Rukmana explained that the channel is covered by soil up to 225 meters. As a result, the water channel is malfunctioning and often causes puddles in the surrounding area.

"The channel width was originally 60 centimeters with 60 centimeters depth, so we do normalization," he expressed, Monday (8/20).

Channels in Petojo Selatan Normalized

He assessed that normalization itself will include sheet pile development using river rock materials. It is conducted, as the sheet pile condition has been severely damaged due to buried material.

"This work has been done since August 3 and is targeted to be finished in mid-September," he stated.

Linked News
Popular News indeks
  1. City Council Strengthens Synergy with Central Legislators to Support Jakarta`s Development

    access_time30-07-2026 remove_red_eye1100 personFakhrizal Fakhri
  2. Jakarta Partners with Five Satellite Cities for Greater Jakarta Connected Initiative

    access_time30-07-2026 remove_red_eye638 personBudhi Firmansyah Surapati
  3. Still Rp 3,500! No Fare Change for Transjakarta’s Kalideres–Soetta Route

    access_time01-08-2026 remove_red_eye545 personAldi Geri Lumban Tobing
  4. Jakarta Reaffirms Commitment to Preserving Cultural Heritage

    access_time31-07-2026 remove_red_eye522 personDessy Suciati
  5. New LapakMain Corner Creative Hub Inaugurated at Tunas Muda RPTRA, Kramat Pela

    access_time05-08-2026 remove_red_eye510 personTiyo Surya Sakti