You don't have javascript enabled. Good luck with that.
Pencarian
Saluran Air Jl Melodi Mas 3 Pegangsaan Dua Dinormalisasi

Channel on Jalan Melodi Mas 3 Normalized

A water channel on Jalan Melodi Mas 3, RW 20, Pegangsaan Dua Urban Village, Kelapa Gading is normalized.

This work has been done since August 3 and is targeted to be finished in mid-September

Kelapa Gading Water Resources Executing Unit Head, Rukmana explained that the channel is covered by soil up to 225 meters. As a result, the water channel is malfunctioning and often causes puddles in the surrounding area.

"The channel width was originally 60 centimeters with 60 centimeters depth, so we do normalization," he expressed, Monday (8/20).

Channels in Petojo Selatan Normalized

He assessed that normalization itself will include sheet pile development using river rock materials. It is conducted, as the sheet pile condition has been severely damaged due to buried material.

"This work has been done since August 3 and is targeted to be finished in mid-September," he stated.

Linked News
Popular News indeks
  1. BMKG: Sunny to Cloudy Skies Forecast Across Jakarta Today

    access_time11-09-2026 remove_red_eye1719 personDessy Suciati
  2. Pramono Urges Jakmania to Keep Jakarta Safe

    access_time11-09-2026 remove_red_eye479 personDessy Suciati
  3. Pramono Endorses Five-City Tour for Jazz Goes to Campus

    access_time12-09-2026 remove_red_eye454 personDessy Suciati
  4. No Damage Reported Following Magnitude 5.9 Seribu Islands Quake

    access_time12-09-2026 remove_red_eye446 personBudhi Firmansyah Surapati
  5. Ketapang TPS 3R Processes 13 Tons of Waste from Duri Pulo and Petojo Utara

    access_time11-09-2026 remove_red_eye433 personFolmer