You don't have javascript enabled. Good luck with that.
Pencarian
 Pengerukan Kali Cakung Capai 26 Persen
.
photo Nurito - Beritajakarta.id

Cakung River Dredging Reaches 26 Percent

Cakung River dredging in Ujung Menteng Urban Village, Cakung, East Jakarta has reached 26 percent. Dredging is done to increase river's capacity ahead of rainy season.

It is done to anticipate inundation or flood in Ujung Menteng, Pulogebang, and Penggilingan Urban Villages

East Jakarta Water Resources (SDA) Sub-dept. Head, Mustajab mentioned, dredging should be done to prevent inundation in Ujung Menteng and Pulogebang Urban Villages.

Cakung River Drain Cleaning Started

"Cakung River still can be functioned though it cut off by KBT channel. We need to dredge it because of silting," he explained, Thursday (9/20).

According to him, dredging starts from Palad Pulogebang to Jalan Raya Penggilingan. Its length is about 1,240 kilometers. This project is started since early August and it is targeted to complete in early December.

"It is done to anticipate inundation or flood in Ujung Menteng, Pulogebang, and Penggilingan Urban Villages," he added.

Cakung River is dredged with depth for around 1.5-2 meters. Before dredging, its depth was around one meter due to sedimentation.

Total river's width is 16 meters. But it remains 12 meters since its left and right sides are used for sidewalk.

Linked News
Popular News indeks
  1. Water Channel Dredging on Bendungan Melayu Reaches 50 Percent

    access_time18-09-2024 remove_red_eye828 personAnita Karyati
  2. Jakarta Leads Medal Standing at PON XXI

    access_time17-09-2024 remove_red_eye781 personFolmer
  3. Jakarta Aeromodelling Team Grabs First Gold Medal

    access_time16-09-2024 remove_red_eye556 personAldi Geri Lumban Tobing
  4. Area Arrangement on Jalan Kramat to Complete this Weekend

    access_time17-09-2024 remove_red_eye428 personTiyo Surya Sakti
  5. Area Arrangement on Jalan Setapak Reaches 95 Percent

    access_time14-09-2024 remove_red_eye363 personTiyo Surya Sakti