Channel on Jalan Pisangan Lama 2 Drained
access_time October 28 2018 04:35 PM remove_red_eye 1504
Reported by Nurito | Translated by Nugroho Adibrata
Reported by Nurito | Translated by Nugroho Adibrata
35 personnel of Pulogadung Sub-district Water Resources Taskforce are cleaning up a water channel on Jalan Pisangan Lama 2.
This is a follow-up action after controlling. It is targeted to be finished on November 1
It is done, as the channel was previously full of 213 PKL stalls. It was controlled on October 17.
Channel on Jalan Cileduk Raya CleanedPulogadung Sub-district Head, Bambang Pangestu stated that the channel is drained up to 350 meters length with 80 centimeters width.
"This is a follow-up action after controlling. It is targeted to be finished on November 10," he stated, Sunday (10/28).
Hopefully it would make the place more beautiful and would be free from inundation when it rains.
"PKL that have been netted will be relocated to Enjo Market," he said.